Text
.
L p
i.
9 Tcl: phone 617 366-9011 ReTggp] D6c8 M
,,.......m.
YANKEE ATOMIC El.ECTRIC 00MPANY
- E~il, g
WMY 76-107 e
YAmxes
'{ d i s
d Westborough. Massachusetts 01581 s.
9, September v
28, 1976 2
h 9
10
\\Q 6
s REcudg.4 United States Nu tory ' mission g
Washington, D. C.
'J55 cf OCT 4 g g Office of Nu. p M 14 5 il Attention:
. Reactor Regulation Victor Stello, Jr., Director Division of Operating Reactors O
b C
References (a) License No. DPR-3 (Docket No. 50-29)
(b) License No. DPR-28 (Docket No. 50-271)
(c) License No. DPR-36 (Docket No. 50-309)
Dear Sir:
In response to a request by your representative, we are enclosing copies of our administrative, operating, and maintenance procedures dealing with fire protection that are now in use at our three operating plants, Yankee Rowe, Vermont Yankee and Maine Yankee.
There are two general documents, prepared and promulgated by the Yankee Atomic Electric Company, affecting all three operating plants.
Copies of these are attached as Appendix A.
They are:
1.
Guideline No. 5, Policy for Control or Work Practices and Fire Prevention Within Operating Plants.
2.
YAEC Safety Standards, Section 4, Fire Prevention and Control.
The following documents have been developed and promulgated by the Yankee Rowe operating plant. They either de-1 directly with or hcve some
- sections affecting fire protection at the plant. Copies are attached as Appendix B.
They are:
1.
AP-0200, Rev. 3, Plant Design Changes 2.
AP-0201, Rev. 5, Plant Modifications 3.
AP-0202, Rev. 4, Engineering Design Changes 4.
AP-0205, Rev. 4, Maintenance Request 5.
AP-0210, Rev. 3, Control of Special Processes 6.
AP-0214, Rev. 3, Installation and Maintenance of Safety Classified Systems, Components or Structures 7.
AP-0501, Rev. 2, General Plant Training Program 8.
AP-0503, Rev. 1, Fire Protection Training 9.
OP-Memo 2E-2, Plant Fire Brigade Personnel
._Oi.$dN 083079}
{
(.a United Stctss Huclear Rigulctory Commiesicn Sspt;mber 28, 1976 E
Attn Office of Nuclear Rrictor R2gulation Paga Two AP-5002, Rev. 2, Maintenance Department Corrective and 10.
Preventive Maintenance Program AP-5005, Rev. 2, Standard Welding and Inspection Procedure 11.
12.
AP-6003, Rev. 3, I&C DepartLent Maintenance Program 13.
DP-5625, Rev. 3, Annual Fire Extinguisher Inspection DP-5626, Rev. 4, Monthly Fire Extinguisher, Hose Station 14.
and Hose House Ir.spection
- 15. OP-2111, Rev. 2, Supervisor's Standard Search Procedure 16.
OP-2707, Rev. 1, Operation of the Fire Protection System 17.
OP-3010, Rev. 1, Fire or Forced Evacuation of the Control Room 18.
OP-3017, Rev. O, Fire Emergenc>
19.
OP-3300, Rev. 3, Local Emergency Procedure 20.
OP-4210, Rev. 4, Fire Pumps Operability Test 21.
OP-5100, Rev. 4, Valver Fitting, or Pipe Section Replacement end/or Repairs DP-5630, Rev. O, Annual Fire Protective Equipment Inspection 22.
The following documents have been developed and promulgated by the Vermont Yankee operating plant. They either deal directly with or have some sections affecting fire protection at the plant. Copies are attached as Appendix C.
They are:
1.
AP-0032, Rev. 4, Duty and Call Officers 2-RP-2186, Rev. 3, Fire Protection System RP-4186, Rev. 3, Fire Protection System Surveillance 2
4.
OP-3020, Rev. 4, Plant Fire Emergency Procedure OP-3023, Rev. O, Vermont Yankee Fire Brigade 5.
Maintenance Dept. Instruction 76-2, Rev. O, Cable Penetration 6.
Sealing The following documents have been developed and promulgated by the Maine Yankee operating plant. They either deal directly with or have some sections affecting fire protection at the plant. Copies are attached as Appendix D.
They are:
1.
Proc. 0-00-6, Rev. O, General Plant Training Program 2.
Proc. 2.50.10, Rev. 1, Fire Emergency Proc. 3.1.9, Rev. 5, Fire Pump Testing 3.
Proc. 15-2, Rev. 3, pages 34 and 35, Security Faults Checklist 4.
Proc. 15-3, Rev. 3, Form MY-SEC-15-72, Sheets 1 through 3, 5.
Routine Operator Patrol Check-off Sheet The four attached Appendices include all plant procedures presently in It should be effect at our operating plants that deal with fire protection.
It is not our intention noted that these procedures are periodically updated.
We trust this submittal provides the information to forward these revisions.
you need at this time.
If you have any question, or if we can provide you with further information on these procedures, please contact us.
Very truly yours, YANKEE ATOMIC ELECTPIC COMPANY W-J. L. French Manager of Operations EAS/kg
~
1 NRC ronu 193 U.S. NUCLE AR F.EGULATORY '
1MISSl!N EM QO-@NUMf309 271
=
- 2. m g
""V"2'"
NRC DISTRIBUTION roR PART 50 DOCKET MATERI AL TO:
FROM: YANKEE A'10MIC ELEC CO DATE 05 DOCUMENT US(IRC WESTBOROUGH, MASS 9-28-76 J L FRENCH DATE RECOVED 10-4-76 f_} LE TT E R ONoToRazEo PMor INPUT roRu NuueER or Coe ES RECEivEo
)OCory
$ Siqg -4ot,c,- 143 LonlGIN AL UNC LASSt rlE D 4
DESCnlPTIoN ENCLOSURE LTR TRANS THE FDLIDWING...............
APPENDIX "A"... POLICY FOR CONTROL (R OR WORK INED FOR FIRE PROTECTION FDR THEIR THREE PRACTICES AND FIRE PREVETTION WITHIN OPERATING OPEPATING PLA.NTS...............
PLANTS..... APPENDIX B.... FIRE PREVENTION AND CONTROL..... APPENDIX C.....DOCUENTS AFFECTING VERBONT YANKEE OPEPATING PLANT..... APPENDIX D..
DOCUMENTS AmunNG MAIN YANKEE........
Nb..N E
=
PIANT NAME:
YANKEER0WE/VERLONTYANKEE/
DONOT J-MAINE YANKEE g4 MS SAFETY FOR ACTION /INFORMATION ENVTRO 10-5-70 rkb ASSIGNED AD:
ASSlChtb AD:
X BRA CH CitIEF:
St hWGew EA-NED BREh?CH CHTEP.
X PROJECT MANAGER:
30Q. Gell -b9A0E.M0 PROJECT MANAGER!
X IJC. ASST. :
5.%EtMF.D '18%8AM LIC. ASST.!
s-INTERNAL DISTRIBUTION
[ REO Pp SYSTEMS SAFETY PLANT SYSTFug SITE SAFETY &
MTRTPDR _
HEINEMAN TF.npsc0 ENVIRO ANALYSIS X I&E{D SCllROEDER M
BENAROYA DENTON & MULT FR
)(JEL.D
~
LAINAS GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECH _
MIPC MACCARRY KIRKWOOD ERNST CASg KNIGHT EALLARD HANAUER SIllWEIL OPERATING REACTORS SPANCLER JMdESS PAWLICKI STELLO
~
RTTE TFCH PRO,TECT MANAGEMENT REACTOR SAFETY OPERATING TECH.
cAF24TLL
_BOYD ROSS X
EISENHlTP STEPP P. COLLINS NOVAK S11A0 1HILMAN
~~
110USTON ROS7.TOCZY f*
BfrER
~PETE'RSON ClliiCK X
BtTELER M)
SITE _.AHALYSIS MELTZ GRIMES VOLLMER jlELTE{tES AT 6_I
,X W AMMGM EUNClf
\\
SKOV110LT SALTZMAN L_f0LLINS PERifd9.ECb,M M.
RtITnERG FRFCFR dggy6eRo, yT.
EY.TEIJ,UAL DISTRIBUTION CONTROL NUMBE R
.NAT IAB:
BR00K1IA.YEILFAT_L/dl_
4 X Ll'DR :M_TT, Hf..
7.[EG., VIE ULRIKSON(ORNij g TIC:
(f [
I NSIC:_
IA _l'DR g7
[L. 3Nf_RMt.b 4f N f fi N N!) ONNd
_ 1 00 0 w CONSULTANTS gg% m m ASI.B M ACRSM; CYS,/1101 nTNCN h N
m m@mG m pn ha'A.% nm
~
i~
mmm uw n
i V W iJ iG QyIIMeibnuhaNLi4
"