1
\\
. +.
JUN 17 377 Docket No.[50-29 /
u Yankee Atonic Electric Company ATT!h Mr. Robert H. Groce
~~_
Licensing Engineer 20 Turnpike Road L
Westboro, Massachusetts 01581 U
Gentlemen:
RE: YANKEE-ROWE AT0tilC POWER STATION By letter dated December 1,1976, we sent sample fire protection Technical Specifications to you for your guidance in proposing Technical Specifications. You responded by application for license amendment dated March 15,1977. Based on your response, the responses of all other licensees of operating power reactors and further review and considera-tion by us, we have revised the sample Technical Specifications and are enclosing a copy for your guidance. These revisions do not change the i
scope of the equipment or administrative controls covered by the h
previous sample fire protection Tecnnical Specifications. However,
['.
the action statements have been revised to describe nore appropriate i
corrective measures to be taken in the event a liniting cendition for j.,
operation is not tet. There have also been changes in the surveillance frequency on sone items for consistency with the overall system surveillance scnecule.
Upon ccmletion of our evaluation of the fire protection program for your f acility, the Technical Specifications for your facility are to be revised to incorporate all elenents of the final fire protection systems and ac:.iini-strative controls. Allowance will be made for coaifications that recuire additional time to complete by naking certain equipment or system specifi-cations effective at the time such equipnent is installed and operable.
In the interim, until we are able to conplete our evaluation of your fire protection submittal, we will require implementation of fire protection Tecnnical Specifications on :.e existing fire protection equipnent and ct:ninistrative controls at your plant. Therefore, you are requested to resuoait such proposed interin Technical Specifications within 20 days of
,D
'.]b ovvnCE %
99nsuplzg ga s,._.__.._,.,,.Pqmf mc - m,.u- -
Waw
- r som.
t w
a
(
(
=
F Yankee Ato:nic Electric Company J U N 1 7 7977 i :.
We expect your resubmittal to include all your receipt of this letter.
ele-ents of these revised sample Technical Specifications in the detail indicated including specific identification of equipment such as snoke The only acceptable reason for not proposing a specific item detectors.
given in these sample Technical Specifications would be that no such In such cases equipment or systen presently exists at your facility.
[: ~
where you depart from the sample Technical Specifications, state the justification in your application.
I Sincerely,
/
f A. Schwencer, Chief Operating Reactors Branch i/1 Division of Operating Reactors
Enclosure:
Sample Technical Specifications
[
.i cc w/or.ct:
t-See next pace lc DISTRIBUTION Docket NRC PDR LOCAL PDR ORB #1 Reading ASchwencer SMSheppard ABur g>r TWambach OELD OILE(3)
ACRS(16)
TBAbernathy JRBuchanan DEisenhut DOR:0RB#1 DORS 0RGAl DOR:0
.va~.e lk, Ab
.,,,c.,
['
ABur r
._J/17/ 77 6//7/77
..._. 6/I7L..
e....-
Wu.s.>-.venuwareniPOUD NRC TCRM 318_ (9 76) NRCM 0240
D
'7 w:
Yankee Atomic Electric Ccmpany 3'-
June 17,'1977
==I i,.8......
cc:. ltr. Donald G. Allen, President
=5.
Yankee Ath:aic Electric _ Company
~==
20 Turnpi%e Road Westboro,liass:chusetts -01581 Er P
- Greenfield Public Library-402 ficin Street
-Greenfield, ilassachusetts 01581
'E -
Eq:p....
1 Q.
l
.a_.
3:=.:.
n k O'. '*
"'?".?ik
=
=
s 1
L. -.
! ~
jr E F.97 pry "' 2 T
i.
~
-~I<--
i
---.y r
yv.-
y,.-
n.
v-~,.
.,,y w
v y,
-re