ML19339A033
| ML19339A033 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/24/1980 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Millen C PUBLIC SERVICE CO. OF COLORADO |
| References | |
| NUDOCS 8010310579 | |
| Download: ML19339A033 (2) | |
Text
.
{
l'
,e g#8S ', _ n,, i '-
~
DISTRIBUTION (v'/6 4 POR
'-/ C'
' '3 LPDR
'/ "< #
d - 'j f Docket File LFMB Reactor File (2).
DOCKET N0. 50-267 tffre er, SSPB w/ enc 1.
G. Kuzmycz, SSPB w/enci.
R. Diggs, LFMB w/ encl.
LFMB R/F (2) u/ud Public Service Company of Colorado ATTN: Mr. C. K. Millen Senior Vice President P.O. Box 840 j
Denver, Colorsdo 80201 Gentlemen:
We are in the process of auditing reacter facility cases to detamine what fees are due pursuant to 10 CFR 170.22 for applications for license amendments and other approvals for specific plants such as the Fort St. Vrain facility (License No. DPR-34).
In this connection, we find that your Company has flied a number of applications for your Fort St. Vrain facility which are subject to the fee provisions of 10 CFR Part 170, but no fees were paid when the applications were filed with the Office of Nuclear Reactor Regulation (0NRR) for review. A list of these
.plications and the fees due is enclosed. This audit and the fee determintticas are based on data provided by the ONRR staff as a result of preliminar:.ad/or final reviews of your applications.
The total amount due is $23,200. It is requested that this amount be remitted to our office.
In those cases where final reviews have not been completed by the ONRR staff, if the final reviews reveal that any of these fees are incorrect, an adjustment will be made. We hope that this list includes all applications currently on file for review by the staff of GNRR. In the future, we plan to advise your Company of fees due on an individual application basis and in a more timely manner rather than consolidating many applications covering a long period of time in a single request.
For your information, all applications for license amendments and other plant specific approvals are subject to the fee provisions of 10 CFR 170.22. Section 170.12(c) requires that licensees. provide a proposed determination of the fee class, state the basis therefor, and remit the fee corresponding to that deter-mination with the application.
Sincerely, ur c
William O. Miller, Chief N",ense {ee Management Branch Erii!TdMe:-
< NADM- -
LfM&:ADM-LfMBdDM-N ef> Applications and-Fees Due,.
.gj@. g Ugay.. WOHi.iler.
oart.
10/,l'//SO.
10/ 1 /80-10/
/90-8 010810 379vea~ c~r aa'~r'~c orrics: i'7'-289-35' FORM 318 (9-76) NRCM 324o
t t
i List of Fort St. Vrain Acolications and Fees Due l
UccKet No. 50-257 Acolication and Subiect Fees Due Basis for Fe-i 1.
5/9/78 (P-78062 on snubbers; approved by ONRR 5/25/79)
$1,200 2.
1/11/79 (P-79012 on Nuclear Detector Decalibration w/ suppl. letter 11/29/79-P79275).
4,000 3.
6/11/79 (P-79126 on temporary relief from LCO 4.3.10; approved by ONRR 6/13/79) 1,200 4.
7/25/79 (P-79154 for approval to use Grade H-451 Graphite in reloads; approved by ONRR 10/5/79) 1,200 5.
9/19/79 (P-79210 fee exemption from perfor.7ing annual physical inventory of fuel storage wells; approved by ONRR 2/29/80) 4,000 j
6.
10/25/79 (P-79247 on plateout probe) 1,200 7.
3/11/80 (P-80033 for exemption from performing annual physical inventory of fuel storage wells; approved by ONRR 4/5/80) 4,000 8.
6/5/80 (P-80139 for relief from TS 4.2.9; approved by ONRR 6/5/80) 1,200 9.
9/5/80 (Exemption from requirements of 10 CFR 25 and 95) 4,000
- 10. 9/8/80 (P-80304 for relief from LC0 4.3.10) 1,200 Total Fees Oue
$23,200 t
1
- Administrative or pro forma in nature (Class II)
- Single safety or other issue (Class tII)
_ _ - _