ML19339A010

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-458/80-09 on 800909-12.No Noncompliance Noted
ML19339A010
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/24/1980
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Draper E
GULF STATES UTILITIES CO.
Shared Package
ML19339A011 List:
References
NUDOCS 8010310535
Download: ML19339A010 (2)


See also: IR 05000458/1980009

Text

__ __

_ _ - - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

[5G

-

..

[garow%,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OM

REGION IV

i#

S

611 RYAN PLAZA DRIVE. SUITE 1000

2

/

7~

-

ARLINGTON, TEXAS 76012

%. .. J

% .,$ .

September 24, 1980

En Reply Refer To:

RIV

Docket No. 50-458/Rpt. 80-09

Gulf States Utilities

ATTN:

Dr. E. Linn Oraper, Jr.

Vice President - Technology

Post Office Box 2951

Beaumont, Texas

77704

Gentlemen:

This refers to the inspection conducted by Mr. L. D. Gilbert of our staff

during the period September 9-12, 1980, of activities authorized by NRC

Construction Permit No. CPPR-145 for River Eend, Unit No. 1, and to the

discussion of our findings with Mr. T. C. C ouse and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection and oJr findings are discussed in the

enclosed inspection report. Within these areas, the insoection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no items of noncompliance were identified.

Two new unresolved items were identified in paragraphs 2 and 3 of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

,

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such infonnation be withheld from

public disclosure. The application must include a full statement of the reasons

why it is claimed that the infonnation is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8010310536

g

_.

.

_ _

__ __. . . . _

_ _. .

_

_ .

. _ - - .. - .

._

_ _.

_

.. ___

__ _ _

!

!

l

'

-

.

i

)

Gulf States Utilities

-2-

September 24, 1980

!

>

o

t

Snould you have any questions concerning this inspection, we will be pleased

4

to discuss them with you.

i

Sincerely,

1

1

.

^= -

^

}

. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-458/80-09

'