UNITED STATES tY g
NUCLEAR REGULATORY COMMISSION O
j rAsumanu. c. c.2csss p'
70 hi'i 95n.L N ft,l 3
Docket Nos. 50-321/50-366 EA-80-32 Georgia Power Company ATTN: J. H. Miller, Jr.
Executive Vice President 270 Peachtree Street Atlanta, GA 30303 Gentlemen:
This refers to your letter of July 14, 1980, which responded to the Notice of Violation and Notice of Proposed Imposition of a Civil Penalty sent to you with our letter of June 19, 1980, concerning an excessive radiation exposure rate inside the tractor cab of the vehicle transporting waste from Plant Hatch to the licensed curial site at Barnwell, South Carolina.
After careful consideration of your response, we have concluded for the reasons given in the enclosed Order that the item of noncompliance did occur as set out in the Notice of Violation, and that a civil penalty should be imposed as proposed in the Notice of Proposed Imposition of a Civil Penalty.
Accordingly, we hereby serve the enclosed Order on Georgia Power Company imposing a civil penalty in the amount of Four Thousand Dollars ($4,000).
Your response stated that corrective measures have been implemented to preclude a recurrence of this type of incident.
Based on a July 31, 1980 telephone conversation between H. C. Dance of our Region II (Atlanta) Office and R. J. Kelly of your staff, it is our understanding that your procedures were being revised to require low range (0-2mR/hr) instrumentation usage and a comprehensive survey of all normally occupied positions in motor vehicles used to transport radioactive materials. These corrective measures will be examined during a subsequent inspection in this area.
CERTIFIED MAIL RETURN RECEIPT RE00ESTED l
80103103f 7 g
, 1 _-
SEP e4 580 Georgia Power Company 2-In accordance with 10 CFR 2.790(d), a copy of this letter and enclosure will be placed in the NRC's Public Document Room.
Sincerely,
//,.,r R. C. DeYoung, Act g Director Office of inspection and Enforcement
Enclosure:
Order Imposing Civil Penalty cc w/ encl:
W. A. Widner, Vice President M. Manry, Plant Manager C. E. Bel flower, Site QA Supervisor a