//Wb f
s,o, UNITED STATES py$v,,j NUCLEAR REGULATORY COMMISSION'
,}
,C W ASHINGTON. D. C. 20555
,/
September 25, 1980 Docket llo*.* $0-213 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
By letter of July 9,1980 you provided the results of turbine inspections that were performed during the recent refueling outage of the Haddam Neck Plant.
We had requested this information so that the staff could determine if any licensing action was required before the plant resumed operation.
At the conclusion of our review of the inspection results we notified your staff by telephone that we had no reason to delay the scheduled startup of the Haddam Neck Plant. On the basis of our calculations, the two keyway cracks were of sufficient depth that the rotors of the low pressure turbines should be re-inspected within 17.5 months of the initial inspection.
This time frame is consistent with the staff's interim position that turbines operating with known cracks should be re-inspected prior to one-half the time for known cracks to grow to one-half of critical size.
This letter is being sent to you to document previous telephone conversations and to express our agreement with your plan to re-inspect the low-pressure turbine discs during the 1981 refueling outage.
The staff is continuing its analysis of fabrication and operation data for Westinghouse turbines.
We plan to review our interin position when this inforration, and the results of re-inspections of several turbines in 1981, have been evaluated.
We shall notify you if our reassessment affects Haddam Neck.
We accreciate your continued cooperation in this matter.
Sincerely, Dennis M. Crutchfield, C ef Operating Reactors Branch =5 Division of Licensing cc: See next page s 010310 \\ B
Mr. W. G. Counsil September 25, 1980 cc Day, Berry & Howard U. S. Environmental Protection Counselors at Law Agency One Constitution Plaza Region ! Office Hartford, Connecticut 06103 ATTN:
EIS COORDINATOR JFA Federal Building Superintendent Boston, Massachusetts 02203 Haddam Neck Plant RFD #1 Resident Inspector Post Office Box 127E Haddam Neck Nuclear Power Station East Hampton, Connecticut 06424 c/o U. S. NRC East Haddam Post Office Mr. James R. Himmelwright East Haddam, Connecticut 06423 Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Twn Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATIN: Assistant Director Research and Policy Oevelopment De:artment of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 Director, Technical Assessment Di vision Office of Radiation Programs (AW-459)
U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20060