ML19338G540
| ML19338G540 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 10/01/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| GO3-80-2402, IEB-80-20, NUDOCS 8010310080 | |
| Download: ML19338G540 (1) | |
Text
f,>, 0.'
- 9),s
/
-)
A s
9.f :-
l$
y
-Washington Public Power Supply System A JOINT OPERATING AGENCY k".
'8-f h_,
C, 6
'$ sQ. t,so p ooo o.no....
sooo o,e. w..
...... w.,
nc-u
..w..
.ro
..ss:
October 1,1980 G03-80-2402 Docket flos. 50-508 50-509 fir. R. H. Engelken, Director U. S. Fluclear Regulatory Commission Region V 1990 fl. California Boulevard Suite 202 Ualnut Creek Plaza Walnut Creek, California 94596
Dear fir. Engelken:
Subject:
HPPSS iluCLEAR PROJECT T10S. 3 AtlD 5 RESP 0:lSE TO IE BULLETIrl 80-20 The subject IE Bulletin, " Failures of Westinghouse Type W-2 Spring Return to fleutral Control Switches," has been reviewed for application to our fluclear Project flos. 3 and 5.
Although the Type W-2 control switches are used at WilP-3/5, the neutral contacts are not connected to any circuitry. Thus, the problem described in the subject bulletin is not applicable.
Approximately one man-day was expended in performing the actions required by IEC 80-20.
Very truly yours, d
9 D. L. RE;iBERGER Assistant Director, Technology Ic cc: Office of If,E, Division of RCI-Washington, D.C.
- 11. Woods, flus fl. S. Reynolds, DSL 8U108 0 DT0 1