Forwards IE Insp Repts 50-338/80-17 & 50-339/80-30 on 800805-08 & 15-18.No Noncompliance Noted
ML19338G481
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/19/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19338G479 List:
References
NUDOCS 8010290412
Download: ML19338G481 (2)


See also: IR 05000338/1980017

Text

\\

UNITED STATES

!

-

Ij

8'

i,

NUCLEAR REGULATORY COMMISSION

j

I

REGION 11

#

101 MARIETTA ST., N.W., SUITE 3100

i

_

ATLANTA, GEORGIA 30303

.....

-

8

In Reply Refer To:

RII:DJP

50-338/80-17

.

50-339/80-30

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office on

August 5-8 and 15-18, 1980, of activities authorized by NRC License Nos. NPF-4

and NPF-7 for the North Anna facility, and to the discussion of our findings

held with W. R. Cartwright at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examMations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

Licensee commitments regarding matters identified by NRC observers during the

joint VEPC0/ State of Virginia emergency planning exercise held on August 16,

,

1980, were discussed with VEPCO management following the exercise.

These

commitments are stated in confirmation of action letter, J. P. O'Reilly to

J. H. Ferguson, dated August 19, 1980.

In accortace with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

i

that ' proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

'8010 2 9 0 7/A

__

._ _

_

.

  • ,#---

-

-,

-

-

,--i

.,

, , . -

,.w-

e

e-

.

.-

..-

-

-

.

-

.

'

Virginia Electric and Power Company

-2-

SEP 191980

.

Should you have any questions concerning this letter, we will be glad to discuss

,

them with you.

Sincerely,

i

Philip St

r, Chief

.

uel Facilit and Materials

Safety Branch

.

Enclosure:

Inspection Report Nos. 50-338/80-17

and 50-339/80-30

cc w/ encl:

W. R. Cartwright, Station Manager

P. G. Perry, Senior Resident Engineer

Neil.Proto, General Counsel

Nuclear Safety Oversight Committee

1133 15th Street, N. W.

Suite 307

Washington, DC 20005

,

t

O

e - w I - * -. w.% .w. .

+ . ~ + -

_ , . _ ,

, , , , , , , , ,

_ , , , , _ , , , , . ,