Notification of 801016 Meeting in Bethesda,Md to Discuss Adequacy of TVA Test Program Re Protection Against Breach of Containment
ML19338G412
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/10/1980
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Butler W, Israel S, Speis T
Office of Nuclear Reactor Regulation
References
NUDOCS 8010290247
Download: ML19338G412 (2)


Text

-

m R3[iATORV ]DCKET FILE COPY.

~

0 0

OCT 101980

. \\.

_a J

oo o

Docket Nos. 50-327 and 50-328 MEMORANDUM FOR:

Stanford Isreal, Acting Chief

]

Reliability and Risk Assessment Branch, OST i

Walter R. Butler, Chief Containment Systens Branch, DSI Themis P. Speis, Chief Reactor Systems Branch, DSI s

Zoltan R. Rosztoczy, Chicf Equipment Qualification Branch, DOE Franz P. Schauer, Chief Structural Engineering Branch, DOE Victor Benaroya, Chief Chemical Engineering Branch, DOE FROM:

A. Schwencer, Chief Licensing Bran:h No. 2, DOL

SUBJECT:

MEETING ON SEQUOYAH INTERIM DISTRIBUTED IGNITION SYSTEM PROGRESS The Sequoyah Unit No.1 full power license requires by January 31,1981 that it be shown the proposed TVA interim control system provides with reasonable assurance protection against breach of containment in the event a substantial quantity of hydrogen is generated.

To this end, TVA submitted a test progras (Volume I 3 II, dated September 2, 1980) that requires our final coments to assure the TVA program meets our needs.

A meeting is scheduled for October 16,1980 (P-ll4 at 9:00 a.m.) to discuss the adequacy of the TVA program. A copy of the TVA program is attached. Also, CSS has proposed the enclosed schedule for the effort which will be discussed at the meeting.

4 Each branch identified above is requested to attend. By this memorandum other branch representatives are invited if they believe they will be involved in the IDIs program for Sequoayh.

If possible advance comments on the TVA program l

l O FFIC E h.........

.4

$h hh

4..

2-should be provided prior to the meeting to the Project Manager. Contact, Carl Stahle, Project Manager, if ther.e are any questions.

Original signed by A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

A:: stated cc w/o enclosure:

~~

~ ',

Branch Chiefs Assistant Directors DISTRIBUTION:

Docket Files (50-327/328)

NRC PDR Local PDR LB#2 File A. Schwencer l

C. Stahle M. Service I

  • SEE PREVIOUS CONCURRENCES OFFICE h CURNAMEh