ML19338G410

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deficiency Re Pipe Support Strut W/Mechanical Shock Arrestor
ML19338G410
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/20/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Byran J
UNION ELECTRIC CO.
Shared Package
ML19338G411 List:
References
NUDOCS 8010290246
Download: ML19338G410 (1)


Text

-

- _ =

UNITED STATES E'

"n NUCLEAR REGULATORY COMMISSION

/

/

g

*e REGION lli t

799 ROOSEVELT ROAD

%,..... e*

GLEN ELLYN. lLLINOIS 60137 OCT 2 0 1980 Docket No. 50-483 Union Electric Company ATTN:

Mr. John K. Byran Vice President - Nuclear Post Office Box 149 St. Louis, MO 63166 Gentlemen:

Thank you for your letter dated October 7, 1980, pursuant to 10 CFR 50.55(e) regarding Bergen-Paterson pipe support strut with mechanical shock arrestor. We will review this matter during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely, RC4Q G. Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Mr. W. H. Weber, Manager Nuclear Construction Director, RCI/IE Director, AE0D Chief OEB/,PA IE Files cc w/ltr dtd 10/7/80:

Central Files 1

PDR Local PDR NSIC Regicas I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission 0 01029n SW