v Public Service Company 2 Odomde 16805 ROAD 19%
PLATTEVILLE, COLOR ADO 80651 October 24, 1980 Fort St. Vrain Unit No. 1 P-80377 Mr. Karl V. Seyf rit, Director Nuclear Regulatory Cornission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Ref erence:
Facility Operating License No. DPR-34 Docket No. 50-267
Dear Mr. Seyfrit:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
80-53, Final, submitted per the requirements of Technical Specification AC 7.5.2(b)2.
Also, please find enclosed one copy of the Licensee Event Report for Reportable Occurrence Report No. 50-267/80-55.
Very truly yours, Yus.s Don 'Jarembourg 9
Manager, Nuclear Produc. tion D'4/cis Enclosure Doo3 cc: Director, MIFC g
//
8410280 $ Q :,
L n
b 1
REPORT DATE:
October 24. 1980 REPORTABLE OCCURRENCE 80-53 ISSUE O OCCURRENCE DATE:
September' 26, 1980 Page 1 of 4
(
FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WE1D COUNTY ROAD 191/2 PLAITEVILLE, COLORADO 80651 i
REPORT NO. 50-267/80-53/03-L-0 Final IDENTIFICATION OF OCCURRENCE:
During performance of the scheduled loss of outside power and turbine trip surveillance test, the automatic 13 load progracnning sequence did not oper-ate. This is reportable as a degraded mode of LCO 4.6.1.d)3 per Fort St.
Vrain Technical Specification AC 7.5.2(b)2.
EVENT DESQtIpTION:
On September 26,- 1980, during a maintenance shutdown period, the semi-annual test of the standby diesel generators was conducted. The test verifies the automatic de-energization and load shedding f rem the essential 480V busses.
It also verifies that the standby diesel generstors start from ambient con-ditions on the auto-start signal and energizes the auto-connected (programmed) loads through the load sequencer. Refer to Figure 1.
- he sequent al load programming is handled by two parallel programmers lA t
and 13 2 Th ese are independent of each other and if. one does not operate, the other one will energize the required equipment. The 13 program was scheduled for test but i
did not start; therefore, the 1A program automatically took over and started to carry out the required actions as designed. Since the 13 program was to be tested, the test conductors terminated the test' at that point. Had an-actual loss of outside power and turbine trip occurred, automatic load j
sequencing would have been completed on the 1A program.
Electrical maintenance personnel examin :4 the 13 program Aquipment and found relay 286G13 had a wire interfering with contact 12/12C U3 This pre-vented e initiation of the 13 program, but did not interfere with contact 11/ llc which started the la program.
)
I 4
--,-wy.
w w
-- r =
--mw
- - mrm w
v"
+v---
ww w
v--*iw
-.e
~
p m v
N REPORTABLE OCCURRENCE 80-53 ISSUE C Page 2 of 4
CAUSE
DESCRIPTION
Failure of the LB program to operate was due to a wire blocking the 12/12C contact of the 286G13 relay.. The wire had been inadvertently repositioned by being pulled somewhere along its length. This moved the wire into such a position that the 12/12C contact was blocked frca closing. The reason for the laterference of the wire and the relay is not determinable.
CORRECTIVE ACTION:
1.
The wire was repositioned such that it no longer interfered with relcy operation.
2.
The other wires on relay 286G13 and on the unaffected relay 286G1A were examined to insure there was no other interference.
3.
The surveillance test was satisfactorily completed.
4.
Electrical naintenance personnel have been informed of tae situ-ation and instructed to be cautious while performing their work.
No further corrective action is anticipated or required.
g.( ;,.M
.-.ay...-.---
... g,, g
... g
"'2 L '*~ s i '
.. 3
.a... p
.g m -- s. + fs; ;...,,
/
.9.. gbg J
f.'
t.
p g'
'E
.9 m 1
~g p
0
? '4;H-+!r-&
l I
N O
o
-(
d i
a s
ar 5
'l*t p
12G14 4
-- l a
,f
,. r y.-
..Ja.c..n.
i cm e -. s y
=
a -
i t s. g 4,j : $
I r.
.-4 5.,.,.,.
- n a
i.
', REPORTABLE g-
- - l*
d
. st=:
=,. l gl.,,
- - s e.s i
.e
- c, s :
E g aN
'U j0CCURRENCE f: ~gf. Me =~N,~"i
'9
~ ' ~ ' - '
4 M
,,, M G 2 h-5 y e!I g80-53 C i l, -'
) ISSUE O I
7,
^
r-+-
es.
1W-
.Page 3 of 4 A "*-i ' 3 2s*QF i
.=.
3
. ! 't 2
.-- s,
5 t
i g
go =
E, f.^gbM d
gi.FJ C.'
C l
3
- - r i
r
.u g j R-g-e 3
a 1
t. Q' a
ct-i m
a 2oO 4.**i
- I e'
I "-9 I
L
}
s.,'
l s'J
.r qt
$. o.c [k%
f !,..# $j Y*:6'i.~""I'l,
CE
')
O d.
3.E 1.*.
d o E E.,,, '27 d1
't: ar 3!
- - g.,,)t.,.,>,a -h i
4 4s r*1 9
=. l r i,.p;. e, s - ---.
o c
k_
i f
i s
'1 y
II
.>-.s-
'. " ft th.
-+. 4.s*
e r s
d P-cy z r~-ve.J
~'.- Q.. $.. &.d..m A.f g.:*8.4""
$9 y * '.$",k >
y r. s i
7 r.
4 Ww>
r [s
2mm
[
1
.L O.
a,.#
. ? I ef g q.
" !.w-.
- - i.
.4 t
w w-
- I.h.,.
3 e
~[d.lla*1:(.g ~
+-
< ~---m- 'i~ :
qy>1; a.
y$
sq =dw' lm{ -
1E t
u ii sp Sa-m I
cL 3
3.-'..r-a
, ej a:p 7
- - v --g [,
. el q--9
- - pjg I
Q0=i s
n u
m W
t 3.,.
rArn l,3 1 ;
ti.n,!
ms
~
1 :p -
p. m...
t
,vb.
- -,c,.a. y,..
.,. i
.s n.rd.
.,m.-
'l
-'~
v s
D
.?..
.<n-s e,d. e-I W
=
!l${
..e.
I 8.,. 7 2 a ; i3w =n e.s,4.,.
e 3
6 4
I a
I tan
- a.
$" ';;-f. 3,,,,, ' ' ] * -
9 4.
l #5 g *- I 6
3 s
a
(
3.%
du,
1 T- -+
y, 3
t d.s n.z :u r.u n w s on a
y' I
-.t
IA
- - 8 t
J l',,','..M. (.S '
a i M
f ks,gls
=====w i
^
I r',
e e,
t af
+6a, J
r-;4 e-7*'
= s.- l i J e,- ! '
.r 2, ;,
.t
_s e
p. j gb f**
f
'IT h'""" 3 Il' 'f lY--- ----hM!
D-h d 2
"** 4 wI
~
- - e i
, i 2
t 99-t ai ii,
=4 ^* a e4 i*
- $ r.
l v
3
, j*
.3 g2 k. Q - --c4 ?
d 4-eJ d
i b.a l:.
.re-
a.1.
i T8
.-t, 0
e3 t
- !U, i he l i.
l a **L 4
l i,,e.
-.* 2 3
,, 4 :-
O*
i
'.!,c 8J i..
h. l e.
l
~
s; - b
- f~~g
t>
Mt
~
p?
3e ei
?
a -
1-!
)
u;..
,: f W
_m
ir-
.-* f,.. t _*
j*;
i' T :.
gar"O
...i. :.r 1
..j
- - r
- - 4 y:.
[
4 l, s f*
4L l Op 4 L' 5.,;, 2.l ',9 ! d...,9ti. '.,.? !!. $
j Q4
. Q,.r 88..
i9
. e...
s e
5 qt l
y*.
- 9. et I
,.I 'J" g
)
L'.-a
': C v.
s.-... s..;.e...
..se).. du-
.ee+-.
~
.x :,-
. -l g.?,....
- - aj g.
..- 1:
. L;
, rrt
. ~..
CI
,. 2 :
4-i:
!m e y,j. I i
. A;p J.'
e,#'a,4:de wg so t '-----
.e i i. trfWe I r..
w
~
Ib CC I
O4 a, e a
., M j
s p-'-
i e
a
.r e..
3'
)
'>U c e y ms g i 3,"y" j 4
- - l gi t., W, 2M
~
4l%.. i, i -
a
- q i
s o
..i zt 3{.
s.
.L
- - f w.
.~= Y t.
g
- - g i..
l M*\\.
a<
~-
7, d
fle g*
M S
. pf s
s Q' l9 I'
t
[
qi L
, 4 4. 'n.
J D
!.,m
?
e5-: :aa av :uns : r sw s.
},
p.
- - A g.L"-
Q m
- . u.. ~. =
. -+w-
- -
__-..,,,.. m.
i REPORTABLE OCCURRENCE 80-53 ISSUE O Page 4 of 4 Prepared By:
Asa B. Reed
/
Technical Services Technician Reviewed By:
. g Gahm Technical Services Supervisor Reviewed By:
/ )'2'l-f b.bh Frank M. Mathie Operations Manager 7)Tw Approved By:
Don Wareebourg V
Manager, Nuclear Production O
q
,,,. ~,. - -
.-y
- - r
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000267/LER-1980-001-03, /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | /03X-1:on 800108,leak Found on 1B Helium Circulator Static Seal Internal to Circulator.Caused by Mfg Defect That Acted as Stress Riser & Caused Cyclic Failure of Bellows Matl.Circulator Replaced | | | 05000267/LER-1980-001-01, /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | /01T-0:on 800108,while Operating Plant at Approx 1.5% of Rated Power,Leak Discovered on Helium Circulator Static Seal Internal 1B to Circulator.Cause Unknown.Reactor Shut Down & Circulator Replacement Begun | | | 05000267/LER-1980-001, Forwards LER 80-001/01T-0 | Forwards LER 80-001/01T-0 | | | 05000267/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000267/LER-1980-002-03, /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | /03L-0:on 800107,during Region Constraint Device Installation,Found That Startup Channel Scram Protection Not Operable at Less That or Equal to 100,000 Counts/Second. Caused by Improper Setpoints.Setpoint Change Initiated | | | 05000267/LER-1980-003, Forwards LER 80-003/03L-0 | Forwards LER 80-003/03L-0 | | | 05000267/LER-1980-003-03, /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | /03L-0:on 800110,while Reactor Was in Shutdown Condition,Three Hangers Found Impaired,Which Caused 21 Sys to Be Impaired.Caused by Failure to Reinstall Hangers Following Removal for Sys Mod.Hangers Will Be Modified | | | 05000267/LER-1980-004-03, /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | /03L-0:on 800114,following Performance of Class I Shock Suppressor Surveillance Test,Two Snubbers Found Inoperable.Caused by Personnel Using Snubber Units as Stepping Platforms.Snubbers Repositioned | | | 05000267/LER-1980-004, Forwards LER 80-004/03L-0 | Forwards LER 80-004/03L-0 | | | 05000267/LER-1980-005-03, /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | /03L-0:on 800111,during Release from Gaseous Waste Holdup Sys,Recorder Did Not Function Properly.Caused by Bad Bull Drive Gear & Clutch Assembly.Parts Replaced & Recorder Returned to Operation | | | 05000267/LER-1980-005, Forwards LER 80-005/03L-0 | Forwards LER 80-005/03L-0 | | | 05000267/LER-1980-006-03, /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | /03L-0:on 800218,w/reactor at Less than 2% Power, Vent Stack Snubber VSS-117 Was Inoperable & Degraded Mode of Tech Spec LCO 4.3.10 Existed.Caused by Taking Reactor Critical W/Vent Stack Snubber Out of Svc for Maint | | | 05000267/LER-1980-006, Forwards LER 80-006/03L-0 | Forwards LER 80-006/03L-0 | | | 05000267/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000267/LER-1980-007-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt on Switches.Switches Replaced | | | 05000267/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000267/LER-1980-008-03, /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | /03L-0:on 800219,during Routine Surveillance Testing,Setpoints for Low Flow on One Dewpoint Moisture Monitor & for Fixed low-low Flow on Another Monitor Found Less than Min Acceptable.Caused by Instrument Calibr Drift | | | 05000267/LER-1980-009-01, /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | /01T-0:on 800225,while in Shutdown Condition,Test Evaluation Determined Bistable Trip Modules,When Used W/Mtu for Calibr of Process Trips,Induced Calibr off-set Which Could Allow Trips Outside Tech Specs.Bistables Recalibr | | | 05000267/LER-1980-009, Forwards LER 80-009/01T-0 | Forwards LER 80-009/01T-0 | | | 05000267/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000267/LER-1980-010-03, /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | /03L-0:on 800303,at 10% Thermal Power,A Emergency Diesel Generator Would Not Load as Required for Weekly 50% Load Test Surveillance.Caused by Diesel Generator Governor Problem Which Reduced Speed Control Response | | | 05000267/LER-1980-011-03, /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | /03L-0:on 800306-21,reactor Dewpoint Limiting Conditions for Operation Were Exceeded on One Occasion & Operation in Degraded Mode Occurred on Three Occasions. Caused by Problems W/Buffer Helium Sys | | | 05000267/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000267/LER-1980-012, Forwards LER 80-012/01T-0 | Forwards LER 80-012/01T-0 | | | 05000267/LER-1980-012-01, /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | /01T-0:on 800311,while Facility Was Operating at Less than 2% Power,Orifice Valves Not Set for Equal Flows & Temp Limit Was Exceeded.Caused by Inability to Close Orifice Valve to Equal Flow Position.Valve Freed Up | | | 05000267/LER-1980-013, Forwards LER 80-013/03L-0 | Forwards LER 80-013/03L-0 | | | 05000267/LER-1980-013-03, /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | /03L-0:on 800310,during 58% Thermal Power Operation,Indicated Flow for Two Low Level Primary Coolant Dewpoint Moisture Monitors Discovered Less than Requirements.Caused by Inaccurate Flow Elements | | | 05000267/LER-1980-014-03, /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | /03L-0:on 800311,during Reactor Shutdown,Emergency Feedwater Snubber BFS-228E Observed to Be Missing Pin at Piston Rod Eye & Rendered Inoperable.No Cause Stated for Missing Pin.New Pin Fabricated & Installed | | | 05000267/LER-1980-014, Forwards LER 80-014/03L-0 | Forwards LER 80-014/03L-0 | | | 05000267/LER-1980-015, Forwards LER 80-015/03L-0 | Forwards LER 80-015/03L-0 | | | 05000267/LER-1980-015-03, /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | /03L-0:on 800320,during Operation at Approx 60% Power,Emergency Feedwater Header Supply to Loop 2 Helium Circulation Water Turbine Drives Was Isolated to Repair Leaking Pressure Control Valve.Caused by Loose Block Bolt | | | 05000267/LER-1980-016, Forwards LER 80-016/03L-0 | Forwards LER 80-016/03L-0 | | | 05000267/LER-1980-016-03, During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | During Testing,Four of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switches.Switches Replaced | | | 05000267/LER-1980-017-03, /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | /03L-0:on 800311,w/plant Shut Down Due to Loss of Main Cooling Water Return Line,Plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Preempted Time Due to Plant Upset.Sampling Resumed on Next Shift | | | 05000267/LER-1980-017, Forwards LER 80-017/03L-0 | Forwards LER 80-017/03L-0 | | | 05000267/LER-1980-018-03, /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | /03L-0:on 800327,w/plant Operating at Approx 51% Thermal Power,One Loop 2 Hot Reheat Header Activity Monitor Found Inoperable.Caused by Failure of Motorola Chip (MPS-66A)in Operational Amplifier to Detector Preamp | | | 05000267/LER-1980-018, Forwards LER 80-018/03L-0 | Forwards LER 80-018/03L-0 | | | 05000267/LER-1980-019-03, /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | /03L-0:on 800327,operation in Degraded Mode of Limiting Condition 4.2.10 Occurred on Six Occasions & Reactor Dewpoint Limit of Limiting Condition 4.2.11 Was Exceeded Once.Caused by Problem W/Buffer Helium Sys | | | 05000267/LER-1980-019, Forwards LER 80-019/03L-0 | Forwards LER 80-019/03L-0 | | | 05000267/LER-1980-020, Forwards LER 80-020/03L-0 | Forwards LER 80-020/03L-0 | | | 05000267/LER-1980-020-03, During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | During Testing,Two of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Accumulation of Dirt in Switches.Switches Replaced | | | 05000267/LER-1980-021, Forwards LER 80-021/03L-0 | Forwards LER 80-021/03L-0 | | | 05000267/LER-1980-021-03, /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | /03L-0:on 800421,w/reactor Shut Down,Main Steam Pressure Low Instrument Discovered Inoperable.Caused by Bad Connection Due to Dirty Contact.Contacts Cleaned & Module Returned to Svc | | | 05000267/LER-1980-022-03, /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | /03L-0:on 800424,during 800424-0510,operation W/Total Primary Coolant Oxidants Greater than 10 Ppm & Average Core Outlet Temp Greater than 1,200 Degrees Occurred on Five Occasions.Caused by Reaction of Moisture W/Core | | | 05000267/LER-1980-022, Forwards LER 80-022/03L-0 | Forwards LER 80-022/03L-0 | | | 05000267/LER-1980-023-03, /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | /03L-0:from 800507-17,plant Was Operated W/Emergency Feedwater Header Supply to Helium Circulator Water Turbine Drives of One Loop Isolated on Four Separate Occasions.Caused by Valve Leakage & Line Leakage | | | 05000267/LER-1980-023, Forwards LER 80-023/03L-0 | Forwards LER 80-023/03L-0 | | | 05000267/LER-1980-024, Forwards LER 80-024/03L-0 | Forwards LER 80-024/03L-0 | | | 05000267/LER-1980-024-03, /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal | | | 05000267/LER-1980-025-03, /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | /03L-0:on 800523,during 800523-30,total Primary Coolant Oxidants Were Greater than 10 Ppm W/Average Core Outlet Temp Above 1,200 F on Six Occasions.Caused by Moisture Increase & Carbon Monoxide & Dioxide Combination | |
|