ML19338G118

From kanterella
Jump to navigation Jump to search
Forwards LER 80-057/03L-0
Date released: 12/18/2019 Download: ML19338G118


LER 80-057/03L-0:on 800922,during Startup,Rhr Sys Was Removed from Svc & Isolated from RCS at 250 F.Caused by Operator Error.Tech Specs Changed to Clarify Svc Procedure
ML19338G147
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/22/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338G147 (1)
Forwards LER 80-057/03L-0
ML19338G117
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/22/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338G117 (1)