Forwards IE Info Notice 80-36, Failure of Steam Generator Support Bolting. No Specific Action or Response Requested
ML19338F993
Person / Time
Site: 05000363
Issue date: 10/10/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
References
NUDOCS 8010280229
Download: ML19338F993 (1)


Text

Y::Sc.-

,p*2 "%,

,(

,,og, UNITED STATES y

g NUCLEAR REGULATORY COMMISSION c c REGION 1 0'

631 PARK AVENUE

,[

KINO OF PRUSSIA, PENNSYLVANIA 19406 October 10, 1980 Docket No. 50-363 Jersey Central Power and Light Company ATTN:

Mr. I. R. Finfrock. Jr.

Vice President 260 Cherry Hill Road Parsippany, New Jersey 07054 Gentlemen:

The enclosed IE Information Notice No. 80-36, " Failure of Steam Generator Support Bolting," is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, H. Grier Director

Enclosures:

1.

IE Information Notice No. 80-36 2.

List of Recently Issued IE Information Notices CONTACT:

E. G. Greenman (215-337-5267) cc w/encls:

i M. K. Pastor, Project Manager 8010280SM Q

SSINS N3.:

6835 Acc ssion No.:

8006190085 IN 80-36 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

? 9D R9 e3 WASHINGTON, D.C.

20555 Q

October 10, 1980 IE Information Notice No. 80-36:

FAILURE OF STEAM GENERATOR SUPPORT BOLTING Description of Circumstances:

On September 4, 1980, the NRC staff was informed by the Northern States Power Company that extensive cracking of the bolting for the supports attached to bottom of the steam generators on Prairie Island Unit 1 had occurred.

The licensee initially.11scovered the bolting problem when two bolts failed during detensioning.

The licensee was attempting to remove the pre-load on the boltino (s;;acified at 1400 ft-lbs) to minimize the potential for stress co90sion cracking of the high strength 1-1/2 in.

dia.

250 ksi maraging steel bolting (Vascomax 250).

Ultrasonic examination of the support bolting revealed cracks or breaks in 47 of 48 support bolts for the two steam generators at the Prairie Island Unit 1 facility.

The licensee subsequently shut down the Prairie Island Unit 2 facility and performed ultrasonic examinations of the same steam generator support bolting, that failed on Unit 1.

The results of the UT examinations revealed cracks in three of the 48 steam generator support bolts.

The licensee attempted to remove the cracked bolts from the steam generator supports.

Two cracked bolts were successfully removed while the third failed during removal.

Two bolts that were judged as defect free by the ultrasonic examination were also removed.

Magnetic particle examinations confirmed the results of the ultrasonic examinations on the bolts which were removed.

As part of the short term corrective actions taken, the licensee has unloaded and retensioned the bolting at appr timately 50 to 100 ft.-lbs.

Inservice ultrasonic examinction of the affected bolting had been performed i

previously.

In t1e case of Unit 1 a significant number of the bolts were examined at the last refueling outage 14 months ago.

No cracks were found at that time.

The susceptibility for stress corrosion cracking was identified in NUREG-0577 (for coment).

The NUREG identifies those facilities which have utilized maraging steels for reactor coolant pump and steam generator support bolting.

Further the NUREG recommends augmented inspections for the facilities included in Group I.

Licensees are encouraged to revise *:he bolting materials used at their respective facilities and consider inspection of maraging steel bolting that are either pre-loaded or significantly loaded during operation.

This Information Notice is provided as an early notificat. ion of a possibly significant matter that is still under review by the NRC staff.

It is expected that recipients will review the information for possible applicability to their facility.

No specific action or response is requested at this time.

If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

IE Information Notice No. 80-36 October 10, 1980 1

RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued to Notice No.

Issued 80-35 Leaking and Dislodged 10/10/80 All holders of a Iodine-125 Implant Category G or G1 Seeds Medical License 80-34 Boron Dilution of 9/26/80 All holders of a Reactor Coolant During PWR Power Reactor OL Steam Generator Decontamination 80-33 Determination of 9/15/80 All holders of Teletherapy Timer a teletherapy Accuracy license 80-32 Clarification of 9/12/80 All holders of Certain Requirements ar. NRC or Agreement for Exclusive-use State License Shipments of Radioactive Materials 80-31 Maloperation of Gould-8/27/80 Ai? holders of Brown Boveri 480V-Type a power reactor K-6005 and K-Don 6005 OL or CP Circuit Breakers 80-30 Potential for Unaccept-8/27/80 All holders of able Interaction a BWR power reactor Between the Control OL or CP Rod Drive Scram Function and Non-essential Control Air at Certain BWR Facilities 80-29 Broken Studs on 8/7/80 All holders of Terry Turbine a power reactor Steam Inlet Flange OL or CP Supplement Notification of 7/29/80 All holders of a to 80-06 Significant Events power reactor OL at Operating Power and near term OL Reactor Facilities applicants 80-28 Prompt Reporting 6/13/80 All applicants of Required Information for and holders To NRC of a power reactor construction permit

,w-