ML19338F991
| ML19338F991 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/10/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 8010280226 | |
| Download: ML19338F991 (1) | |
Text
f f%
ty o
UNITED STATES
[})#
NUCLEAR REGULATORY COMMISSION S
2 REGION 1
- (M,
. [
631 PARK AVENUE
)
i 0, '
U
%'O o
KING OF PRUSSIA, PENNSYLVANIA 19406 October 10, 1980 D:cket Nos. 50-277 50-278 Philadelphia Electric Company ATTN:
Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
The enclosed IE Information Notice No. 80-36, " Failure of Steam Generator Support Bolting," is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, e H. Grier Director
Enclosures:
1.
IE Information Notice No. 80-36 2.
List of Re ently Issued IE Information Notices CONTACT:
E. G. Greenman (215-337-5267) cc y/encls:
W. T. 'J11 rich, Station Superintendent Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond '.. Hovis, Esquire Michael J. Scibinico, II, Assistant Attorney General 801028022@
O
O IE Information Notice No. 80-36 October 10, 1980 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued to Notice No.
Issued 80-35 Leaking and Dislodged 10/10/80 All holders of a Iodine-125 Implant Category G or G1 Seeds Medical License 80-34 Boron Dilution of 9/26/80 All holders of a Reactor Coolant During PWR Power Reactor OL Steam Generator Decontamination 80-33 Determination of 9/15/80 All holders of Teletherapy Timer a teletherapy Accuracy license 80-32 Clarification of 9/12/80 All holders of Certain Requirements an NRC or Agreement for Exclusive-use State License Shipments of Radioactive Materials 80-31 Maloperation of Gould-8/27/80 All holders of Brown Boveri 480V-Type a power reactor K-600S and K-Don 6005 OL or CP Circuit Breakers 80-30 Potential for Unaccept-8/27/80 All holders of able Interaction a BWR pcver reactor Between the Control OL or C.'
Rod Drive Scram Function and Non-essential Control Air at Certain BWR Facilities 80-29 Broken Stud: on 8/7/80 All holders of Terry Turbine a power reactor Steam Inlet Flange OL or CP Supplement Notification of 7/29/80 All holders of a to 80-06 Significant Events power reactor OL at Operating Power and near term OL Reactor Facilities applicants 80-28 Prompt Reporting 6/13/80 All applicants of Required Information for ind holders To NRC of a power reactor construction permit