ML19338F884
| ML19338F884 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 10/02/1980 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| References | |
| NUDOCS 8010270560 | |
| Download: ML19338F884 (1) | |
Text
D UNITED STATES 1,
NUCLEAR REGULATORY COMMISSION REGION ll 3
g * * * *
- g*['
101 MARIETTA sT., N.W., SUITE 3100 Q
e ATLANTA, GEORGIA 30303 OCT 2 1980 In Reply Refer To:
South Carolina Electric and Gas Company ATTN:
T. C. Nichols, Jr., Vice President Power Production and Systems Operations P. O. Box 764 Columbia, SC 29218 Gentlemen:
The enclosed IE Circular No. 80-22, is forwarded to you for information.
No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely, James P. O'Reilly Director
Enclosures:
1.
IE Circular No. 80-22 2.
List of Recently Issued IE Circulars cc w/ encl:
A. A. Smith, Site QA Coordinator T. B. Conners, Jr.
O. S. Bradham, Manager Nuclear Operations 8010270 8 5
}
{
SSINS: 6830 Accession No.:
8006190055 UNITED STATES NUCLEAR REGULATORY COMMISSION q
[
OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 October 2,1980 IE Circular No. 80-22: CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has deteriained that in two unrelated actions a utility and an architect-engineering company employed tech-nically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.
assumed that the personnel firms supplying these individuals had inve I
and confirmed previous career experiences.
fied persons in both of these cases were discovered as a result of allegations to this effect, this matter warrants your attention.rather than through internal company procedures, we be We are hereby recommending that your employms.mt procedures be reviewed to deter-mine that your company has in effect professional qualifications of employees. employment policies which confirm the i
present procedures do not In the *: vent you conclude.that your
. prompt remedial action in this regard. fully address this matter, we recommend that you take No written response to this Circular is required.
If you desire additional information regarding this subject, contact the Director of th Regional Office.
e appropriate NRC I
J er,,,
,e...,..
,we,
.w.
i.
IEC 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Date of No.
Subject Issue Issued to
~
80-22 Confirmation of Employee 10/2/80 All holders of a power Qualifications reactor OL or CP 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP t
80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part 3
Dimensions 70 fuel facility licensees 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner OLs and PWR cps 1
80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510DU Trip facilities with an i
Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and Natural Circula-facilities with an tion Cooldown OL or CP i
80-14 Radioactive Contamination of 6/24/80 All holders of power P2 ant Demineralized Water and research reactor Syctem and Resultant Internal licenses (operating Contamination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis
/
i_. _ _ _
7.----.-
-.~-
_