Submits Addl Response to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Vendors Currently Performing Actuator Testing to Determine Min Capabilities
ML19338F839
Person / Time
Site: Satsop
Issue date: 09/22/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
GO3-80-2291, IEB-80-09, IEB-80-9, NUDOCS 8010270374
Download: ML19338F839 (2)


Text

I

+

'.?h '. ~.

~

.q jg-~

?

' T/ Q JX.

w" EWashingt:n Public Pswer Supply System I

4 A JOINT OPERATING AGENCY.

j.

September 22, 1980 iG03-80-2291 2

h.

_y

. Docket Nos.-

50-508 50-509 Mr. H. D. Thornburg.. Director U. S.< Nuclear Regulatory Commission

~

. Reactor Construction Inspection

<m Office of Inspection' and Enforcement

' Washington, D.C. -20555;

Dear Mr. Thornburg:

Subject:

WPPSS NUCLEAR PROJECT NOS. 3 AND 5

' RESPONSE TO IE BULLETIN 80-09

-Ref:-

Letter, ser. G03-80-1521, D. L.

Renberger(WPPSS) to H. D.-Thornburg (NRC), same subject. -dated June 25, 1980.

1 The referenced letter forwarded the' Supply System's initial response to IE Bulletin 80-09, "Hydramotor Actuator Deficiencies." In that letter, we indicated that the two contractors who supplied.the subject ITT General Control (ITT GC) actuator models, Valtek Inc. and American l Warming'and Ventilating Company. had been requested to review and re-

- evaluate the actuator designs and to. report any corrective actions

- being taken by August-31,1980. This~1etter is intended to provide Lyou'with an update-of the status of vendor responses to our requests.

v American Warming and Ventilating Company (AWV) it supplying twenty-5 eight ITT-GC actuators with a No. I spring for usc in a damper actuating e

applibation.- As mentioned in the subject Bulletin, ITT-GC is currently N,;

4 performing actuator testing to ' determine their minimum capabilities.

AWV will' compare each damper torque requirement against the ~ITT-GC F Jtests'. statistical minimum output data, which will include a penalty

for. the maximum lossyin spring-output;due to the use of 1060-1070 steel springs.. If the: actuators-cannot be shown to develop sufficient thrust to meet theidamper torque requirements, they will be returned to ITT-GC-for any necessary modifications.

, gy_ '.f l~11 NCA w['khff9' I

0

~

s -

p y

. st p t

~

' ^> V

" t p

10s703 Y'

~

Q a

y p3' f80

.g

_g a

+A g.

3 4

,..17-

-- +

,,-.k,~-

s y,u-gg-

. a.,

c 7:_

y#

N_

,x 1 w p;g g..

- lMr.:Thorniurg., -

G.

m; if$;hi.~.@ ^

~

U. S. Nuclear lRegdlathry Comissioni Fw-Page Two

Response to IE: Bulletin 80 '

.i 4

.Valtek Inc. is also awaiting'the results from the.ITT-GC test program prior to confirming:their actuators are adequately sized.

^

Very truly yours,.

C W UJ+>

o m

j D.:Le Renberger-

~

L Assistant' Director, Technology

^

bk cc:. R. H. Engleken, NRC, ROV

^

W. Woods, NUS' N. S.'Reynolds, D&L'

h. _

g.

4 I

r k

f fk-

{=

'[yG:"._jlf?

.- =

$(op-s et j 'v,

t'N/k

_'( JJ ;'.

N,..

%=

4

.\\'

C y

,_ 3; ; _==

23Ql.N '

3 y

+

,~ ;

.2.-

+

0 t..

b,

- ~sy'i;q;;.3%_

.._ _r#,,,.

s

, -]

'tgd1 k<. -

i 7T.-

'L 2

, -n,.

W--.~..

x:

-Qu i

'