I
+
'.?h '. ~.
~
.q jg-~
?
' T/ Q JX.
w" EWashingt:n Public Pswer Supply System I
4 A JOINT OPERATING AGENCY.
j.
September 22, 1980 iG03-80-2291 2
h.
_y
. Docket Nos.-
50-508 50-509 Mr. H. D. Thornburg.. Director U. S.< Nuclear Regulatory Commission
~
. Reactor Construction Inspection
<m Office of Inspection' and Enforcement
' Washington, D.C. -20555;
Dear Mr. Thornburg:
Subject:
WPPSS NUCLEAR PROJECT NOS. 3 AND 5
' RESPONSE TO IE BULLETIN 80-09
-Ref:-
Letter, ser. G03-80-1521, D. L.
Renberger(WPPSS) to H. D.-Thornburg (NRC), same subject. -dated June 25, 1980.
1 The referenced letter forwarded the' Supply System's initial response to IE Bulletin 80-09, "Hydramotor Actuator Deficiencies." In that letter, we indicated that the two contractors who supplied.the subject ITT General Control (ITT GC) actuator models, Valtek Inc. and American l Warming'and Ventilating Company. had been requested to review and re-
- evaluate the actuator designs and to. report any corrective actions
- being taken by August-31,1980. This~1etter is intended to provide Lyou'with an update-of the status of vendor responses to our requests.
v American Warming and Ventilating Company (AWV) it supplying twenty-5 eight ITT-GC actuators with a No. I spring for usc in a damper actuating e
applibation.- As mentioned in the subject Bulletin, ITT-GC is currently N,;
4 performing actuator testing to ' determine their minimum capabilities.
AWV will' compare each damper torque requirement against the ~ITT-GC F Jtests'. statistical minimum output data, which will include a penalty
- for. the maximum lossyin spring-output;due to the use of 1060-1070 steel springs.. If the: actuators-cannot be shown to develop sufficient thrust to meet theidamper torque requirements, they will be returned to ITT-GC-for any necessary modifications.
, gy_ '.f l~11 NCA w['khff9' I
0
~
s -
p y
. st p t
~
' ^> V
" t p
10s703 Y'
~
Q a
y p3' f80
.g
_g a
+A g.
3 4
,..17-
-- +
,,-.k,~-
s y,u-gg-
. a.,
c 7:_
y#
N_
,x 1 w p;g g..
- lMr.:Thorniurg., -
G.
m; if$;hi.~.@ ^
~
- U. S. Nuclear lRegdlathry Comissioni Fw-Page Two
Response to IE: Bulletin 80 '
.i 4
.Valtek Inc. is also awaiting'the results from the.ITT-GC test program prior to confirming:their actuators are adequately sized.
^
Very truly yours,.
- C W UJ+>
o m
j D.:Le Renberger-
~
L Assistant' Director, Technology
^
bk cc:. R. H. Engleken, NRC, ROV
^
W. Woods, NUS' N. S.'Reynolds, D&L'
- h. _
g.
4 I
r k
f fk-
{=
'[yG:"._jlf?
.- =
$(op-s et j 'v,
t'N/k
_'( JJ ;'.
N,..
%=
4
.\\'
C y
,_ 3; ; _==
23Ql.N '
3 y
+
,~ ;
.2.-
+
0 t..
b,
- ~sy'i;q;;.3%_
.._ _r#,,,.
s
, -]
'tgd1 k<. -
i 7T.-
'L 2
, -n,.
W--.~..
x:
-Qu i
'