Clarifies Aspect of 800725 Commitment Re Installation of Smoke Detection Sys.All 12 Zones of Smoke Detectors for Unit 2 Will Be Installed/Operational During 801101 Outage.All Remaining Zones Will Be Operational at End of Unit 1 Outage
ML19338F837
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/22/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
858, NUDOCS 8010270372
Download: ML19338F837 (1)


Text

.

.~

1-f

- VamorarA Ex.ncTurc Ann Powsm Comarawy Rucuasown.VamoINEA 9996:

4 4

October 22, 1980 Mr. Harold R. Denton, Director Serial No. 858-Office of Nuclear Reactor Regulation N0/RWC:jmj Attn:

Mr. B. Joe Youngblood, Chief Docket Nos. 50-338 Licensing Branch 1 50-339 Division of Licensing License Nos. NPF-4 U.S. Nuclear Regulatory Commission NPF-7 Washington, D.C.

20555

Dear Mr. Denton:

4 FIRE PROTECTION MODIFICATIONS 4

3 NORTH ANNA UNITS 1 & 2 b

i The North Anna Unit 1 Fire Protection Safety Analysis Report dated February, 1979 stated our requirement to install the smoke detector system on Unit 1 by j_

- the second refueling outage. Vepco letter serial no. 655 dated July 25, 1980-3 stated our commitment to install the smoke detection system in Unit 2 areas of the Station during the outage which is presently scheduled to begin on November 1,-1990.

The purpose of this letter is to clarify one aspect of this commitment.

I The smoke detection system consists of 45 new zones of smoke detectors.

Approximately 12 zones will be located in strictly Unit 2 areas,12 zones

]

will be in strictly Unit 1 areas, and the balance will be in areas _ common to Units 1 and 2.

We are currently installing smoke detection in areas common to Units 1 and 2 and accessible areas prior to the Unit 2 outage.

The intent of our commitment is.that all-12 zones in strictly Unit 2 areas will be made operational during the November 1st outage. All 12 zones in Unit 1 areas and all 23 zones in the common areas will be made operational as soon thereaf ter as possible, with all 45 zones operational by the end of j

Unit l's next refueling' outage presently scheduled for January 1, 1981.