Advises of Licensing Status for Facility
ML19338F804
Person / Time
Site: Farley 
Issue date: 10/15/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8010270297
Download: ML19338F804 (2)


Text

.

pa u:og c-p y,,

UNITED STATES gg 8,_

NUCLEAR REGULATORY COMMISSION n

g E

WASHINGTON, D. C. 20555

%,...../

OCT 15 1990

.v Docket No. 50-364 MEMORANDUM FOR:

D. G. Eisenhut, Director, Division of Licensing THRU:

R. L. Tedesco, Assistant Director for Licensing, Division of licensing A. Schwencer, Chief, Licensing Branch No. 2, Division of Licensing FROM:

L. Kintner, Project Manager, Licensing Branch No. 2, Division of Licensing

SUBJECT:

STATUS OF FARLEY 2 LICENSING (OCTOBER 10,1980) 1.

Plant Status I&E has advised that 15 of 24 open items required for fuel loading have been closed and the others have been partially closed.

I&E estimates that the plant will be complete enough to allow license issuance during the week of October 20 and fuel loading during the week of October 27.

Applicant estimated completion of pipe hangars required for fuel loading by October 22.

2.

Fuel Loading and Low Power Testing License Status Addendum to. Final Environmental Statement was issued. The license is in the concurrence chain. All other documents required for license are completed.

3.

Full Power License Status SE Input for Diesel Generator Reliability (PSB) was completed. One of 19 Nm-TMI items is completed and 4 of 15 TMI items are completed.

8010270ff7 g

b

, OCT 151980 Draft SE Input has been prepared for the following items and is being c-held pending receipt of additional information from applicant:

1.

Seismic Qualification - SQRT (EQB) 2.

Environmental Qualification - NUREG-0588 (EQB) 3.

Containment Purge Valves (EQB)

10. Alternate Shutdown Panel (PSB, RSB, CEB, ASB)

III.A.l.1 Upgrade Emergency Preparedness (EPLB)

III.D.l.1 Primary Coolant Outside Containment (CSB)

  • 14.

Containment Integrity - GDC 51 (MTEB)

Draft SE Input has been prepared for the following items and is expected to be completed next week:

  • 3.

Containment Purge valves (CSB)

11. Containment Sump Performance (RSB)
12. RHR Review - BTP RSB-5-1 (RSB)
13. Tests of RCS Valves (MEB)
16. SIS Bypass during Startup (RSB)

I.G.1 Special Low Power Testing (RSB, PTRB)

II.K.3 B&O Task Force - Final Requirements (RSB) 6.

IE Bulletin 80-06 (ICSB) 7.

IE Bulletin 79-27 (ICSB)

Applicant's response to questions on the Q-List (QAB) - 3 weeks overdue -

is expected next week.

SE Input for the following items has slipped two weeks.

4.

Appendix G Exemption (MTEB)

II.B.1 Reactor Coolant System Vents (RSB)

II.B.2 Radiation Shielding (RAB)

II.F.2 Inadequate Core Cooling Instruments (ICSB)

/

L. L. Kintner, Projqct 'anager Licensing Branch No. 2 Division of Licensing cc:

H. Denton R. ledesco A. Schwencer

  • Management asststance requested.