Forwards IE Insp Rept 50-395/80-22 on 800806-08.No Noncompliance Noted
ML19338F761
Person / Time
Site: Summer 
Issue date: 09/11/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19338F762 List:
References
NUDOCS 8010270190
Download: ML19338F761 (2)


See also: IR 05000395/1980022

Text

[M

/

UNITED STATES

8' -

N

NUCLEAR REGUi.ATORY COMMISSION

.

1

$

<E

REGION 11

b[

Q,

101 MARIETTA ST., N.W., SUITE 3100

o

ATLANTA, GEOHGIA 30303

.....

SEP 1 11980

In Reply Refer To:

RIbHLW

w

'

-395/80-2 p

South Carolina Electric and Gas Company

ATTN:

T. C. Nichols, Jr. , Vice President

Power Production and Systems Operations

P. O. Box 764

Columbia, SC 29218

Gentlemen:

This refers to the inspection conducted by H. L. Whitener of this office on

August 6 through 8, 1980 of activities authorized by NRC Construction Permit No.

CPPR-94 for the Summer facility, and to the discussion of our findings held with

J. Connelly at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

B.c.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

8010270/M

Q

A

- .. .

-

.

.

.; .

._

. -

- . -

- -- .

-

.

.

.

- _ .

_

1 , Q

SEP 1 11980

l

South Carolina Electric and

Gas Company

-2-

,

r

.i

!

Enclosure:

i

Inspection Report No. 50-395/80-22

-

1

1

cc w/ encl:

i

A. A. Smith, Site QA Coordinator

i

T. B. Conners, Jr.

0. S. Bradham, Manager