IE Insp Rept 50-358/80-20 on 800806-08.Noncompliance Noted: Review of Preservice Insp & Welding Qa/Qc Procedures,Work Activities,Nondestructive Examination & Welding,Personnel Certification & Data
ML19338F604
Person / Time
Site: Zimmer
Issue date: 08/28/1980
From: Danielson D, Ward K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19338F601 List:
References
50-358-80-20, NUDOCS 8010200670
Download: ML19338F604 (6)


See also: IR 05000358/1980020

Text

. . -

4

U'S.' NUCLEAR REGULATORY. COMMISSION

.

-

0FFICE OF INSPECTION AND ENFORCEMENT

REGION III

.

Report No.: 50-358/80-20

Docket No. 50-358

License No. CPPR-88

Licensee: Cincinnati Gas and Electric Company-

.139 East 4th Street

Cincinnati, OH 45201-

l

Facility Name:

Wm. H. Zimmer Nuclear Power Station

Inspection At-

Wm. H. Zimmer Site, Moscow, OH

Inspection Conducted: August 6-8, 1980-

f,/gr,/fp

-

Inspector:

'K. D. Ward

,/J)%'kY,W

-

c/ J2///d

Approved By:

D. H. Danielson, Chief-

Engineering Support Section 2

.

Inspection Summary

!

LInspection on August 6-8, 1980 (Report No. 50-358/80-20)

Areas Inspected: Review of preservice inspection (PSI) and welding QA/QC

procedures, work activities, nondestructive examination (NDE) and welding

personnel certification, and data; IE Bulletin 79-04 and IE Bulletin 80-08

.

l

activities. The inspector involved a total of fourteen inspector-hours

onsite by one NRC inspector.

'Results: - Of the areas inspected, one apparent item of noncompliance was

identified (infraction - failure to. comply with Code requirements for NDE

,

(

personnel experience - Paragraph 5).

l

l

l

5

4010200 W

.

.

.

..

.

..

.

.-

4

.

t

$-

DETAILS

Persons' Contacted

Cincinnati Gas and Electric Company (CG&E)

,

.~ W. Schwiers, QA Manager

  • S. Swain, Construction Manager
  • R.-Ehas, Senior QC Engineer-
  • J. Weissenberg, QA Engineer-

R. Wood,-QA; Engineer

.

Kaiser Engineers, Inc.-(KEI)

  • E. Knox,. Corporate QA Manager
  • P..Gittings, Manager.QA
  • C. Stanfield, Construction Manager
  • R. Baker, Inspection Supervisor
  • D. Feltner, Construction Engineer ilechanical

S.-Jackson, QA Engineer

T. Smith, Lead Inspector

J. Mowatt, QC. Inspector

Nuclear Energy Services, Inc. (NES)

,

J. Robinson, Level'II-Ultrasonic (UT) and' Liquid Pcnetrant (PT)

T. Caputo, Level I UT

,

Hartford Steam Boiler Engineering and Insurance Co. (HSB)

T. Cox, Authorized-Nuclear Inservice Inspector (ANII)

The inspector also contacted and' interviewed other licensee and contractor

employees.

  • Denotes those present at the exit interview.

-

Licensee Action'on Previous Inspection Findings

(Closed) Noncompliance (358/78-30-02): Fourteen discrepancies were closed

'in RIII Report-No. 50-358/79-17. ~The remaining three-discrepancies were

corrected and reviewed. The inspector,has no further questions.

Licensee Action on IE Bulletins

-Ref:

'a . 'NRC memorandum, dated March 30, 1979~, to CG&E (IE Bulletin No. 79-04

.

titled, " Incorrect Weight for Check Valves Manufactured by,Velan

Engineering Corporation").

.

-2-

,

-

,,. .

-

- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

d

..

E(,-

b.

CG&E letter, dated May 29, 1979, to NRC. Region III (Final response

to IE Bulletin 79-04).

c.

NRC memoranduc, dated' April 9,1980, to CG&E (IE Bulletin No. 80-08

titled, " Examination of Containment Liner Penetration Welds").

d.

CG&E letter, dated' July 7, 1980, to NRC Region III.

(Response

Eto IE Bulletin No.' 80-08).

(Closed) IE Bulletin 79-04, The inspector reviewed the final response for

IE Bulletin 79-04 and has no questions at this time.

,

The inspector reviewed the response to IE Bulletin 80-08 and the actions

taken to date. RIII will review the licensee's written final response to

.

l

IE Bulletin 80-08.

This is an unresolved item.

(358/80-20-01)

Functional or Program Areas Inspected

1.

Preservice Inspection

a.

LGeneral

Ref:

(1) RIII Report No. 50-358/78-19 (PSI)

(2) RIII Report.No. 50-358/78-23 (PSI)

(3) RIII Report No. 50-358/78-30 (PSI)

(4) RIII Report No. 50-358/79-17 (PSI)

b.

Review of Reviewed PSI Procedures

The inspector reviewed field changes to the following procedures:

(1) NES, Ultrasonic Examination Procedure for Piping Butt Welds

and Longitudinal Welds. 80A1168, Revision 1, October 11, 1979.

(2) NES, Ultrasonic Examination Procedure for_RHR, LPCS, and HPCS

Pump Welds. 80A1186, Revision.0, January 18, 1980.

,

-(3) NES, Ultrasonic Examination Procedure for Control Rod Drive

Housing Welds. 30A1184 Revision 1, October 10, 1979.

No items _of noncompliance or deviations were identified.

-3-

-

_

.-

-

,

J

. ~ .

(

' Review of' Data and Certification of Material

c.;

The inspector reviewed the following:

(1) Magnaflux Materials, Cleaner, batch No. 80F027.

j

.

(2) Ultrasonic calibration of~ instruments, calibration blocks,.

j

and' transducers.

(3) Data information was available for the PSI activities to date.

l

.No items.of noncompliance or deviations were identified.

1

d.

NDE Personnel Certifications

.The inspector reviewed the following NES NDE personnel certifica-

tions in accordance with SNT-TC-1A, 1975 Edition,

i

.l

Name

UT

PT

-J. Robinson

II

II

K. Brummet

I.

II

A. Caputo

I

No items of noncompliance or deviations were identified.

i

l

2.

Welding and Quality Assurance

-

a.

. General

A tour was made of the weld test shop by CG&E personnel, KEI

personnel, and the inspector. The KEI QC inspector informed the

.)0RC inspector that in tae.past two weeks he spent approximately

98% of his time in the weld test shop. Prior to the two weeks,

a KEI QC inspector visited the weld test shop approximately

twice a week. The inspector, reviewed the procedure "QC Duties

in Weld Test Shop" and found that there is no specific time for

the QC inspector to be in the weld test shop. The licensee

agreed to revise the procedure. This is an unresolved item

(358/80-20-02).

The EI QC inspector is certified as a Level II in liquid pene-

-tr at examination-(PT). The PT certification was reviewed and

'ound thatLthe KEI Level III examiner on site was certified by

KEI without'a written examination. The NDE is-being performed

i

to-ASME Section III, 1971 Edition, Summer 1973 Addenda.

-L4 -

,

1

j:V

.

,,

.-

'f

.

Weld Rod Control

b.

'

The inspector reviewed the weld rod control system including

purchasing, receiving, storing, ovens, disbursing, and handling

of the weld rod.

No. items of noncompliance or deviations were identified.

c.

' Test Pipe Weld Coupons

The welders test pipe weld coupons are radiographed for acceptance

and the identification was observed steel stamped on the pipe.

No items of noncompliance or deviations were identified.

d .-

Audit, Certifications, and Records

The inspector reviewed CG&E, Field Audit Report No. 316, welder

- certifications, welder performance qualification tests and

procedures qualification records,

t

'

No items of noncompliance or deviations were identified.

e.

Program and Procedures

i

l

The inspector reviewed the KEI QA Program and the following

procedures:

!

(1) KEI, Shielded Metal Arc, AWS Carbon Steel to Carbon Steel

l.

Structural Shapes Charpy Tested A-588 Grade B (as rolled)

3.1.51, February 1975.

(Hanger Qualification).

l

(2) KEI, Indoctrination and Training No. 20, May 1979 for QC

l

personnel performing QA activities.

(3) KEI, Nondestructive Examination Personnel Qualification

l

No. 4.5, R.2, February 1979.

1

In the " General Requirements" of the Kaiser procedure,

j

"Ncndestructive Examination - Personnel Qualification

No. 4.5, R.2, February 1979", all NDE personnel including

l

personnel in radiography, ultrasonic, magnetic particle,

l_

and liquid penetrant examinations are qualified in accordance

'

with SNT-TC-1A, 1968 Edition. . Paragraph 5.4.2 of.the Kaiser

-procedure states that in part, "High school graduate plus

j

six months experience as a certified Level I in.nondestruc-

i

tive testing.

" SNT-TC-1A 1968 Edition states in part,

..

- High school graduation plus two years experience as a

j

"

certified NDT Level 1.in radiographic testing .

.", 'High

.

school graduation plus one year experience as a certified

1

-5-

'

Ja

-

-

_

-

..

--

- __ . _ _ . .-

4

-e

'

10

1KDT Level I:-in magnetic particle testing .

" and "High

.

..

-

school graduation plus two years experience as certified-

"

NDT Level I in ultrasonic testing .

. .

The KEI~ procedure does not state enough experience for,the

i

NDE personnel being certified for radiography, ultrasonic

-

and magnetic particle examinations. This is an item of

~

noncompliance in Appendix A.

.(358/80-20-03).

'

Except' as noted, no items of noncompliance <n: deviations-

were identified.

f.

Observation

-

The equipment 'was in good condition and the inspector observed

-

welders welding in the weld test booths. .The inspector also'

,

observed welding of hangers for the cooling water lines in the

diesel-generator room B and examined the' hanger welds in the'

diesel generator. rooms A and C.

No items of noncompliance or deviations were identified.

l

Unresolved Items

Unresolved items are matters about which more information is required

-in order to ascertain whether they are acceptable items, items of non-

compliance, or deviations. The unresolved items disclosed during the

inspection are discussed in Licensee Action on IE Bulletins and Paragraph

2.a.

,

Exit Interview

1

The inspector met with site representatives (denoted in Persons Contacted

paragraph) at the conclusion of the inspection. The inspector summarized

the scope and findings of the inspection noted in this report.

I

4

1:.

k

.

.

-6':

'

~

. m.

g.

.,

-

-

.