Responds to NRC Re Violations Noted in IE Insp Repts 50-416/80-19 & 50-417/80-19.Corrective Actions:Qc Instruction Issued 800822 to Control Calibr Certification of Torque Multipliers
ML19338F542
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/13/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8010200487
Download: ML19338F542 (2)


Text

L

,o fj fj '

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi tensidaiens P. O. B 0 X 16 40, J A C K S O N. mis SIS SIP PI 3 S 2 0 5 J AMES P. McoAUGHY, JR.

au m mav.ca m se m October 13, 1980 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Director

Dear Mr. O!Reilly:

SUBJECI: Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417

?ile 0260/15525/15526/15521 RII:WPA 50-416/80-19 AECM-80/250 Mississippi Power & Light Ccmpany received a notice of viola-tion as Enclosure 1 to your letter dated September 11, 1980 which transmitted IE Inspection Report 80-19.

This violation concerns calibration and. control procedures for torque wrench multipliers.

Although our response to the notice of violation was due October 6,1980, Mississippi Power & Light is submitting the re-sponse on this date due to the complex nature of the violation, our desire to consider the applicability of 10CFR50.55(e) and to include that determination as part of this report. Therefore, the following is submitted in response to the notice of violation.

CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED The Constructor conducted a review to determine where torque multi-pliers were used for Quality Control acceptance. This review re-vealed that multipliers had been used on the Hori:: ental Transfer Tube Seismic Brace; Residual Heat Removal Pumps A, B, & C; the High Pressure Core Spray Pump; and the Low Pressure Core Spray Pump.

The bolting on the pumps has been retorqued using certified mul-tipliers. Recorquing of the Transfer Tube has not been completed but is documented on Condition Reoort 4151.

Mississippi Power & Light identified this' item as a potentially reportable deficiency and notified the NRC on October 7, 1980.

This is being tracked by PRD Number 30/62.

50 t

j

-8010'200 @f member middie Soutn utiitties System D

MISSISSIPPI POWER' O LIGHT COMPANY Mr. J. P. O'Reilly-AECM-80/250

' NRC Page 2 CORRECTIVE STEPS TAKEN'TO AVOID FURTHER NONCCMPLIANCE A Quality Control Instruction (Calibration Procedure - Torque Wrenches, Certification Procedure - Torque Multipliers) was issued August 22, 1980 to control the calibration / certification of' torque wrench mul--

tipliers. Recorquing and future torquing by Quality Control person-nel using multipliers shall be done'with multipliers which have a

. certification sticker and the actual ratio of the multiplier listed on the multiplier.

DATE TO ACHIEVE FULL COMPLIANCE

-Full' compliance for all future work has'been.tchieved. PRD-80/62 is tracking safety implications and corrective action for previously

-completed work.

Yours truly,

[g J

P. McGaughy,.Jr.

ATR:mt*

cc:

Mr. N. L. Stampley Mr. R. B. McGehee Mr. T.EB. Conner

~

~

Mr. Victor Stello, Director Division of !nspection & Enforcement U. S. Nuclear Regulatory Commission