ML19338F436

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100/80-08 on 800821 Re Mgt Meeting to Discuss Corrective Actions Concerning Imbalance Between Book Records & Physical Inventory Records Re Item Control Areas. Details Withheld (Ref 10CFR2.790)
ML19338F436
Person / Time
Site: 07001100
Issue date: 09/11/1980
From: Cohen I, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19338F435 List:
References
70-1100-80-08, 70-1100-80-8, NUDOCS 8010200361
Download: ML19338F436 (1)


Text

_.

,y

.U..S.

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

. Region I l

Report No.

70-1100/80-08:

l l

Docket No.

[0-1100 Safeguards' Group

.,. License No. SNM-1067-Priority Category 3

l Licensee:

Combustion Engineering, Inc.

l-P.O. Box 500 i-Windsor, Connecticut 06095 l

Facility Name: Combustion Engineering - Nuclear Fuel Manufacturing L

i Meeting. at':

Combustion. Engineering, Windsor, Connecticut Meeting conducted:

August 21,-1980 NRC Personnel:

N A-Il-do I. Cohen, Chemist

  • date signed p

date signed l

date signed Approved by-hf d

Q-/ /-Fo J. H. Joyner hieV, Nuclear Material date signed ntrol.Supp

-Section, Safeguards Branch l

Meeting Summary:

l Management Meeting ~, August 21, 1980 (Inspection Report No. 70-1100/80-08) l Enforcement conference held at Combustion Engineering, Windsor, Connecticut

_ between representatives of'the licensee, Region I staff and a representative of the Office of Nuclear Material Safety. and Safeguards to discuss corrective actions relative to imbalances.between book records and physical inventory:

records of-items within -Item Control Areas.

Nine hours.of Region =I staff time

were: expended at thi_s-' meeting.

Other matters discussed by the Region 1. staff during-this: meeting are discussed in. Inspection Report:No. :70-1100/80-06.

l

~

. Region 1I Form 12-1 (Rev.; August-77)

"88 (34 t

-.