ML19338F429

From kanterella
Jump to navigation Jump to search
Amend 26 to License DPR-70,including Requirement to Implement Safeguards Contingency Plan within 30 Days of NRC Approval
ML19338F429
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/15/1980
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19338F430 List:
References
NUDOCS 8010200349
Download: ML19338F429 (4)


Text

~

g.-

.,x ; ps* **ouq'o+

[

((Q.

g UNITED STATES g

NUCLEAR REGULATORY COMMISSION g

g j t; WASMNGTON. D. C. 20556

%..Q.iT 8 3'

PUBLIC SERVICE ELECTRIC AND GAS COMPANY:

PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY

~

  • ATLANTIC CITY ELECTRIC COMPANY

~

DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE i

Amendment No. 26-

' License No. DPR-70 1.

The Nuclear Regulatory Commission.(the' Commission) has found that:

A. 'The: application for amendment by Public Service Electric and Gas Company..' Philadelphia Electric Company, Delmarva. Power and Light Company and Atlantic' City Electric Company (the licensees)

  • dated June 30, 1980 complies with the standards a'id requirements of the Atomic Energy Act of 1954,' as amended (the Act) and the Commission's rules;and regulations's'et forth in 10 CFR Chapter I; B.

The facility will operate in conformity'with the.aoplication, the' provisions of the - Act, and the. rules and regulations of the-Commission;

~.

C.

There is reasonable assurance (1).that the activities authorized

-by this amendment can be conducted without endangering the health and: safety lof the-public, and (ii) that such activities will be conducted in compliance with ~the. Commission'sfregulations; D.

The' issuance of this amendment will not be inimical to the common

. defense and security or to'the health and safety of the:public; and-E.1The issuance of this amendment is in accordance with 10 CFR Part 51 Lof' the Commission's regulations and all: applicable requirements have :b~een satis fied.

f A 0 1 0 2 0'o; gg

,.9 5

- s j;

'2.

Accordingly, Facility Operating License-No. DPR-70 is' nereby amended i

so that: paragraph 2.D. reads as follows:

i The' licensee' shall fully implement and maintain 'in effect

?

all provisions' of the NRC approved physical. security; plan,.

F.

Lincluding amendments and changes. made pursuant. to -CFR.50.5A('p).

k The approved security pla', withheld from public disclosure n

i pursuant to :10 CFR 2.790(d), collectively titled " Salem Nuclear Generatin'g Station,: Unit Nos.1 and 2 Physical' Security Plan",

dated May:24, 1977-as revised September 29 1977-and August 3,1978 and February.16, 1979, includes, as a revised Chapter 8, the t

'NRC approved Safeguards Contingency Plan as: transmitted by letter:of June 30,o1980.

3.

This license amendment is effective as-of1the date of'its issuance.

-F THE NUCL GULATORY COMMISSION E

'~

.even A.

arga, Chii

~ Operating Reactors nch #1

~ Divi sion -of.' Licensing Attach ent;

. Changes to:the Technical Specifications

- Date of Issuance: l September-15, 1980 i

1 J

f

~

Y U

{_ _

2

O;fi ATTACHMENT TO LICENSE AMENOMENT NO. 26

' FACILITY OPERATING LICENSE NO. DPR-70 '

-DOCKET.NO. 50-272 T

- Revise ppendix: A-as. follows :

Remove Page.

Insert Page 15-5 W

9 1

e t

t -

O e

b 9

<3

+

E 4

.~

s

~

s

4

~

v.

-o-l D.

'The licensee. shal1 fully. implement and maintain'in effect all-p' ovis' ions. of the. NRC approved physical ~ security plan, r

including amendments and changes. made pursuant to.10 CFR~ 50.54(p). -

~ The approved security plan. withheld from public disclosure

. pursuant to 10 CFR 2.790(d), ~ collectively. titled " Salem Nuclear Generating Station,: Unit Nos.1 and 2 Physical Security Plan",

dated'May. 24, 1977 as' revised September 29,1977 and August 3,1978 a nd :Februa ry 16~, 1979, includes, as a revised Chapter 8, the -

~_NRC approved Sa feguards Contingency Plan as ' transmi tted by

_ letter of June 30,.:1980.

In accordance with the requirerent imcosed by b e October - 8,1976, order

'E.

o. toe. United States: Court off Appeals for the District of Colu:rbia Circuit in Natural Resources refense Council v. Nuclear Reculatory -

Cor.~ission, No. 73-13a5 ana 7.;-1566, tna

ne Nuclear ?.egulatory Ccenission "shall'make any licenses granted tetween July 21, 1956 and

.such time when the mandate is~ issued subjecc to the outcome of the proceedings herein," tne license a endrent-issued herein shall be suoject to t, e outcome of such proceedings.

n 7.

? ior to. startup following 2.e first regula-ly scheduled refueling cutage,..

?.::11e. Service Electric and Gas Ca pany shall install, to the satisfaction of :ne Comaission, a Ic79-:er= means of protection agair.s: reactor coolant systea; over-pressurizatica. ben water-solid.

_ G.' "his amended license is effective as of the da:e cf its issus ce.

Facility C.pera:ing, License No. C??:-70, as amendez, sn111 expire at mii.ight, Sep erner 25, 2005.

e,.c...:... _

.. w--..

..,.ss CO.,:-- -,.

.w

c. ssw h,

7, Y. s ---}-f., lDi R:ger 5. 5cyd.; Dirt.;; cort Division of ro;e:: Ma.agemer.-

Office of Nuclear..:.eac:ct Re ulation.

Attaennents:

- 1.

Incomplete Preoperational Bsts, Star tup Tests,.ard 0.er Itec.s-thica Must; be Cccpleted 2.

Page Cnanges to Tecnnical Specifications,

. Appendix A 32:e c!> Issuance: D e : e:: be

'., 19 H-D"*D

  • ]D TY@

o.Ju.1.\\lfb.

Jo w.

e e

-