Forwards Summary of Completed Fire Protection Requirements. Hose Stations,Fire Barrier Penetration Seals,Administrative Controls & Switchgear Room Floor Penetrations Have Been Completed Since 1980 Refueling,W/O Subsequent NRC Review
ML19338F422
Person / Time
Site: Maine Yankee
Issue date: 10/14/1980
From: Groce R
Maine Yankee
To: Clark R
Office of Nuclear Reactor Regulation
References
WMY-80-140, NUDOCS 8010200342
Download: ML19338F422 (2)


Text

^ '

,6 g% IX-Way

/'

MN#E 5

    1. EE ATF5!FF0FE6CFB7FE*

s TURNPIKE ROAD (RT. 9) g Lg[f ENGINEERING OFFICE WESTBORO, MASSACHUSETT 0 1

bmmy$

B.3.2.1 WiY 80-140 October 14, 1980

' United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Office of Nuclear Reactor Regulation Division of Licensing Mr. Robert A. Clark, Branch Chief

Reference:

(a) License No. DPR-36 (Docket No. 50-309)

(b) USNRC Letter to MYAPC dated April 24, 1978 (c) MYAPC Letter to USNRC dated February 12, 1980 (WMY 80-22)

Dear Sir:

Subject:

Summary of Completed Fire Protection Items The purpose of this letter is to document the completion of the fire protection items delineated in the attached table. During recent conversations with Mr. Requa of your staff (October 8,1980), it became apparent that many fire protection items had been completed unbeknownst to the NRC.

Whereas the NRC had made a site visit following the 1978 refueling, similar confirmation visits were not performed subsequent to the 1980 re fbeling.

To preclude any further confusion in this matter, Maine yankee, at the request of Mr. Requa, confirms that the fire protection items listed in Table 1 have been implemented as detailed in Reference (b).

We trust this -information is satisfactory; however, should you desire further information, please feel free to contact us.

Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY

~

Robert H. Groce Senior Engineer - Licensing RHG/kab Enclosure i

(

-._801 o ace + 2.

F

)

.$.e r

d

)

+

- Tablef1 ff Fire Protection Recuirements '

Summary of Completed'Sta

^t 4

LItem

' 3.l'. 2(c) ted cable tray rooms (5 6, 5 7)

~

JHose Stations

. Protected'and unprotec 14 Psimary auxiliary building (5 14)'

2

~

Containment penetration areas (5 8) 3 a (5 18)

Fuel building and radioactive -control are 4.

Turbine bu'ilding (5 9)-

t 6)

.5 Containment spray pump buildin's (51 i lock area (5 6..

Ventilation equipment and pers'onnel a r

~

7 Unprotected utilizer room (5 4) 6.

)

Emergency feedwater ptmp area (5 19

)'

9 Steam and 'eedwater valve area (5 20 10.

l Fire Barrier Penetration' Seal _s 3 1.9 Fire Barrier-Penetration Seal _s

~3 2.3

{

Administrative Controls fire brigade support personnel fire brigade members, and 3 1 17

'1. ' Fire. drill schedules for;the!should be the s t personnel should-be' in 2

h titled, " Minimum Brigade Training for the fire brigaded supporcom l

2

. Training."

2-Ez rant Riock Valv'es o

. 3 2d' Floor Penetrations, Protected-Switchgear' Room f

. 3 2.9 5.

d:

not.been-installed in.the'protecte a

lls -(5 3); see Reference ~(c). -

The Calvert Bus Duct seals.have orlbe, fore-

.~

tallation should be completed on s

(switchgear and battery room wa I

i

,'.,2) - TheIhydrant1blockivalve. ns

!. December: 311l1980, t

s e-

'i 1

(