UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION-
-In the Matten of-
)
Docket No.:
50-237-
)
" Commonwealth-Edison Company-
).
'(Dresden-Nuclear Power' Station 1).
. Unit;No. 2)
)L CONFIRMATORY ORDER-I t
Commonwealth-Edison Company (the " licensee") is the holder.of Facility Operating License No.;DPR-19;(the " license") with.an expiration date of June 22,'1971 which authorizes operation of theLDresden Nuclear Power Station Unit No. ? (the
" facility").
i.
- The Licensee had applied in a timely mann'er for a conversion to a full term operating-license.
This application.is'under_NRC review.
II On June 28, 1980, during a routine _ shutdown of the Browns' Ferry Nuclear _ Power -
~ Station Unit 3-reactor, a manual scram from.approximately 35% power' failed to insert'allfof the control rods. ~Three scrams were initiated over a period of
~ bout 14 minutes:to achieve full insertion of-all of the contro1' rods.
a The control rods which failed to~ insert were' all located on.the east side of-the
' reactor core.'
Investigation indicated that this was caused by water unknowingly accumulating in the east side' scram discharge volume-(SDV).
This' accumulation
'l 18010.200 N7 u-s
,m
. i, 4
.. g-riduced'the availableifree' volume for scram water' discharge and inhibited control rod insertion..It is believed'that an obstructed vent and/or drain caused the
~
accumulation of water. LThis accumul,ation of water was not detected'by the-reactor protection system because it stayed within the'SDV headers and'did.not
- drain to the. scram. discharge instrumented volume (SDIV).
L0n July 2,.1980, a-team of NRC Headquarters representatives went'to the Browns
~
Ferry: site' to; gather detailed information on the' event and its related considera-tions.
IE Bulletin No.~80-17. " Failure of 76 of 185-Control Rods to Fully Insert During a-Scram at a BWR"fwas issued on July 3, 1980 and requested actions to be taken by all< licensees of operating General Electric designed Boiling Water-
' Reactors. - Among the actions requested were the following:
1.
- 1.
Within'3 days from the date of this Bulletin, perform surveillance tests to-verify that there is no significant amount of. water in the Scram Discharge Volume (SDV) and' associated piping and that tht SDV-vent valves.are operable and vent system is free of obriruction."
"3. :At'the-conclusion of the. scram tests and all other scrams,. verify that all venti: lines in the SDV are functional.
Verify that there risino-significant: amount of water in:the SDV'and associated piping."
4 N -
"S.
Review and: develop surveillance' procedures such that scram discharge
')
U
. volume.is monitored daily.for residue water for 6 days and, if-i resultsLare acceptable,-the interval mayLbe' extended to 7 days."
.h*
m
.n pp:x m -
.il g ;y l___
~
[
- y
. ~. -
j s-1 - -
3__
.n s Addition'alfactions.applica'ble-to these BWR facil1 ties were request'ed in..
(Suppleme'nt$Nos;I
,1:'2, tank 3 to'IE Bulletin 80-17;,these'. supplements were issusd ~
I
~
1 lon ' July 118, N.ulyf 22! and August 22,~1980,- respectively.
Specific. actions were
. requested LwN.hl re'g'ard.'to the : unobstructed. veriting and ' draining of the SDV.
In.
-.particular,[I'temBiof5upplementIrequestedthefollowing:
5 i
~ " B.' Actions.to be akenLby BWR' Licensees and Completed:by September 1,-
1980:
{7 1).
In' stall a system to continuously monitor water levels in all 4
El scram discharge volumes. ' Continuous recording and alarm.
features;must be included in the design.
Consideration should.
be given to use.of diverse level' sensors in this (these) system (s).
~
4 The design 1in' stalled sh'uld-represent the design with-the highest-o 2
i level of-reliability compatible with' completion.of installation.
~
-.by Septembe'r 1,:1980.- ' Provide _a written description.of.the
' system 1 design to the NRC Regional-Office.
r
[
- Iffinstallation byDSeptember 1,c1980.is not possible,: by August 15, 1980,
~-
ii
~
' subm t to the NRC Regional 0ffice:
f r
k a
2 I'
L1)l Documentation'in detail why the: installation cannot be completed-1
+
.(by-September 1, 1980.'
+
^
F t+
Y
_ Y
.y u
[
- s
~'
, w v
j
--J',
p b V S,
- = -
" ~ '
1
[(
[.;
~
~
4--
f '
2). -A commitment to a firm schedule for installation.
te 3)
A commitment.tb_ equipment. changes and/or surveillance' requirements in addition to'those now'in effect that will provide adequate-assurance 1of SDV' operability in the interim until: installation
.is complatAd."
1 The licensee. responded to this request in-Supplement'1 to the Bulletin'by-letter dated August 15, 1980.
This response'was-unacceptable on.the basis that it.did
~
not' provide adequat'e a'ssurance that'the licensee'could maintaln scram capability at all times.during current operation.
The Bulletin and its Supplements were-
' ssued to provide'such assurance during an interim period of operation untilian i
~
ultimate resolution is achieved by changestin system design and operating procedures.
In v.iew of the.:; foregoing considerations the NRC staff.has concluded that partic-ular criteria must betsatisfied.in order to provide adequate justificationifor continued operation'.
Criteria. applicable to the licensee's facilities are set-
- forthJin Section:III. 1These. criteria. reflect NRC judgement 1that continuous monito' ring Lof the SDV.with appropriat'e. indication and alarm in the. control room >
.is..to be' completed no'later than specified) Until the.~ installation is complete Eand. operable',. surveillance checksiof the-SDV shall:be made at-least once:per
~
oshift"wheneverlthe. reactor is critical.
j i
g, r
A
~
'-Q,
-d g
m
_;.6, 7
a ~ e-_}.[
o?
w
-m,,,
s
,w a,,,
=,
y
=
z
s These; matters were the' subject'of the discussions between NRC and licensee representative Mr. : R.JJanacek on September 11, 1980.
The discussions provided-
- the 'information on which the licensee made further commitments to satisfy'the requests of the Bulletin and its supplements.
These commitments were documented-by letter dated September'19, 1980 from the. licensee.
In view of the importance of,these commitments-to safe operation of the facility, it.is' appropriate to confirm the licensee's commitments by order.
III "Accordingly, pursuant to the Atomic Energy Act of 1954, as amended, and_the
' Commission's regulations in 10 CFR Parts 2 and 50, IT IS HEREBY ORDERED, EFFECTIVE IMMEDIATELY, THAT:
1.
By-December-1, 1980, the licensee shall:
a)
Install and make operable a systemLto continuously monitor water levels in all scram discharge volumes (SDV).
lb)
The installed system'shall provide for level-indication, with an-
~
-associated, alarm, in_the control room, for each SDV.
This (;quipment shall; provide sufficient'information to the. reactor operai
-h R
m
- that if. water accumulates ;in 'either SDV the decision about actions 1
-to be takenlcan be made in a timely l fashion from the control room.
4 1
r
~'
A 1..
D._
a l 2.
Until the system described in III.1 is installed and operating satisfac-torily the licensee shall increase surveillance of-the SDV water level to at.least once per shift.
The once per shift surveillance checks shall be
- at least 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> apart.
3.
The licensee shall submit a report to the Director, Reactor Operations Inspection, Washington, D.C. 20555 and to the Director of the appropriate-NRC Regional Office, confirming installatioa of the continuous water level monitoring system with provisions for indication and alarm in the
- control room, at the time the installation is completed.
IV
'Any person who has an interest affected by this Order may request a hearing within twenty-five (25) days of the date of the Order.
Any request for a hearing will not. stay the effectiveness of this Order.
Any request for a hearing shall be submitted to the Secretary, U.S. Nuclear Regulatory Commission,
~
Washington,1D.C. 20555 with a' copy to the Executive Legal Director at the same address.
A request.for'a hearing should describe specifically the manner in whichLthe petitioner's interest is affected by this Order and should address
- the criteria set forth in 10 CFR 2.714(d).
If a hearing is requested by a
. person who has an. interest affected by this Order, the Commission will issue an order designating the time and place of~any such hearing.
4 P
e S
4 e
a m 9
,'8 4
~7 -
'If^a hearing;-is held, the i'ssue to be cons'idered at such a hearing shall be
. whether.the-licensee should perform the actions. required in Part:III of
-this Order..in accordance'with the schedule stated therein.
Operatio'ntof the facility on terms' consistent'with this Order is not stayed
.by the pendency of any proceeding on the Order.
FOR-THE NUCLEAR REGULATORY COMMISSION s
Victor Stellor Jr. /
Oirector Office of Inspectio'n and Enforcement Effective Date:.0CT 2 1980 Bethes.da, Maryland w