University of l inois at Urbana-Champaign o
j Nuclear Engineering Program 2M Hnfear Enginuring Laborofory 9-9-80 i
Urbono, litinois 61801 (217) 333 2295 l
1 Docket No. 50-151 Docket No. 50-356 A. B. Davis, Chief Fuel Facility and Mat. Saf. Branch Region III U. S. Nuclear Regulator Commission 799 Roosevelt Rd.
Glen Ellyn, Ill.
60137
Dear Mr. Davis:
This is in reply to your letter of Sept. 2, 1980 regarding the inspection conducted by Mr. R. A. Paul. Actions that have been taken and those that will be used in the future are enclosed.
i Sincerely, b
ff2/
N
~
.deorge I. Miley, Chairman Nuclear Engineering Program Enclosure CC:
G. P. Beck 8010200 g o T-
y-
+
p.
' Written Statement for Item of, Noncompliance
- Reports:No. 50-151/80-02; 50-356/80-02 Corrective ~ Action Taken-During the inspection on August 20, 1980, a telephone request was made to Argonne National Lab personnel for a copy of the certification and safety analysis of the 7A ' shipping container that had been utili 4 to ship radioactive materials to the Argonne National ~ Lab. This. certification and safety analysis was received on - August 25, 1980..It is presently filed with other. materials related to these shipments.
Corrective Action to be Taken to Avoid Further Noncompliance This was' an. oversight on our part.since these shipments were the first
- for this type of materials from the' Nuclear Reactor Laboratory.
It had been assumed that the shipping container met.the specifications because of the labels on the outside of the container. Ilowever, in the' future, written confirmation will be obtained previous to shipping of class A materials.
This will be' the joint responsibility of the Reactor Supervisor and the Reactor Health Physicist.
Date o_f Full Compliance f
-This was corrected on August 25, 1980 with the receipt of the certification and safety analysis from the Argonne National Lab.