ML19338F256

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Util Valve Wall Thickness Verification Program.Approves Mar 1973 Date for Submittal of Formalized Program
ML19338F256
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 02/22/1973
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338F257 List:
References
TASK-06-04, TASK-RR NUDOCS 8010140651
Download: ML19338F256 (1)


Text

..

.is t' s

UNITED STATES

, { g t.

ATOMIC ENERGY COfv i. SSION s

1 DIRECTORATE OF REGULATORY OPERATIONS f

[

REGION til

  • '**nt 799 ROOSEVELT ROAD TELEPHONE GLEN ELLYN, ILLINOIS 60137 (312)858-2660 February 22, 1973 Co:=onwealth Edison Company Docket No. 50-10 ATTC: tir. Byron Lee, Jr.

50-237 Assistant to the President 50-249 P. O. Box 767 50-254 Chicago, Illinois 60690 50-265

. Gentlemen:

Thank you for your letter of February 15, 1973, dealing vir5

~

your program to assure that valves important to nuclear safety installed at the Dresden and Quad-Citics Stations meet design vall thickness requirements.

In your February 15 letter, you state that you will sub=it a for lized valve wall thichiess verification progran to us by the end of liarch 1973. This delay is agrecabic to us, and'un will co=plete our evaluation of your progran at that tino.

Sincerely yours, Boyce H. Crict Regional Director bec w/1tr dtd 2-15-73:

R0 Chief, RCB R0 Chief, RT60B RO: liq (4)

Licensing (4)

_DR Central Files Regions I & II PDR Local PDR MIC DTIE PO W GR?QNAL 80.to no u,