f^N Commonwealth Edison j/
) one First National Ptara Chicago, Illinois o
( C ] Address Reply to: Post Office Box 767
/ Chicago, Illinois 60690 September 24, 1980 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Zion Station Units 1 and 2 Technical Specification Changes Regarding Decay Heat Removal Capability and Minimum Level of Water Over Irradiated Fuel i
NRC Docket Nos. 50-295 and 50-304 References (a):
July 11, 1980, letter from Darrell G.
Eisenhut to All Operating PWHs (b):
August 15, 1980, letter from Thomas M.
Novak to All Westinghouse PWH Licensees
Dear Mr. Denton:
Reference (a) reouested Commonwealth Edison Company to amend the Zion Station Technical Specifications with respect to reactor decay heat removal capability, specifically while in shutdown mode of operation.
Reference (b) also requested Commonwealth Edison to review and amend, if necessary, the Zion Station Technical Specifications regarding the naintenance of a minimum level of water over the top of irradiated fuel.
Commonwealth Edison has been performinq detailed reviews of the areas identified in References (a) and (b) with respect to the current Zion ".'echnical Specifications and the St.andard, Technical Specifications for Westinghouse PWRs.
Since re ;ponses to the requests of References (a) and (b) are due within a couple of weeks of each other, and since both requests primarily address refueling activities, Commonwealth Edison proposes combining both requests i
into one submittal.
This approach provides for more ef fective utilization of Commonwealth Edison's On-Site and Of f-Site Review l
personnel, Currently, Commonwealth Edison review functions are
^
reviewing four separate amendment requests from the NRC staff.
The scope of these reviews are quite extensive and will require additional time for completion.
Commonwealth Edison anticipates that the consolidation of the above :equests into a single submittal to the NRC staf f will be completed by October 31, 1930.
aexoo70 5"s'7
O 2-Please address any questions that you rnight have concerning this matter to this of fice.
One (1) signed original and thirty-nin5 (39) copies of this letter are provided for your use.
Very truly yours, f.f l
W. F. Naug n
Nuclear Licen ing Administrator Pressurized W. iter Reactors cc:
Resident Office - Zion
~,.l p