ML19338F085

From kanterella
Jump to navigation Jump to search
Statement of Matl Facts Re Presence of Genuine Issue to Be Heard,In Opposiion to Tx Pirg Motion for Summary Disposition of Contention AC 8.Natural Gas Generation Does Not Constitute Viable Alternative
ML19338F085
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 10/02/1980
From:
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML19338F070 List:
References
ISSUANCES-CP, NUDOCS 8010070508
Download: ML19338F085 (1)


Text

.

O UflITED STATES OF AMERICA f1VCLEAR REGULATORY C0fli11SS10ft BEFORE THE AT0f11C SAFETY AllD LICEf1SIflG B0AP.D In the Matter of

)

)

HOUST0f1 LIGHTIllG & POWER C0f1PAfiY

)

Docket tio. 50-466

~

(Allens Creek fluclear Generating Station, Unit 2)

)

fiRC STAFF STATEf1 Erit OF MATERIAL FACTS AS TO WHICH 1

A GENUIf1E ISSUE EXISTS TO BE HEARD 1.

j f1atural gas generation is not econmically preferable to nuclear power generation and, therefore, does not constitute a viable alternative to the Allens Creek fluclear Generating Station.

2.

The provisions of the Powerplant and Industrial Fuel Use Act of 1978, which provides for restrictions and prohibitions on existing and new natural gas generating facilities with certain defined exemptions, i

could present a factual and legal bar to the consideration of natural i

gas as an alternative fuel for baseload generation.

(

4 l

8010070f0T

-