Provides Implementation Details of TMI-2 Task Force Lessons Learned short-term Requirements,For Items Having 801001 Submittal Date,In Response to NRC
ML19338F041
Person / Time
Site: Pilgrim
Issue date: 10/01/1980
From: Morisi A
BOSTON EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
80-246, NUDOCS 8010070445
Download: ML19338F041 (2)


Text

- _

.Iy

.~

WOSTON EDISON COMPANY Gs=enai, Orr. css eco Sov6 eros. S asse soevow. MassacMustTTs 02199

" O L"'

October 1, 1980 ut;CLEAA OPSAATIONS St:PPORT DEPattlelff BEco Ler. #80-246 D. G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293

Subject:

Implementation details of iMI Action Plan Requirements

References:

A) NRC letter from D.G. Eisenhut to All Operating Nuclear Plants and Applicants for Operating Licenses and holders of Construction perstits, dated September 5, 1980, Preliminary Clarification of TMI Action Plan Require-ments.

B) BEco letter #80-54, dated April 4, 1980, Implementation Details of Lessons Learned Short Term Requirements.

Dear Mr. Eisenhut:

In accordance with the Licensee submittal schedule established in Reference (A),

this letter provides the NRC with Boston Edison's respense to those NRC Task Action Plan (TAP) items having an October 1, 1980 licensee submittal date. The TAP items requiring a licensee submittal by October 1, 1980 are:

1.

II.E.4.1 Dedicated Hydrogen Penetrations 2.

II.K.3.13 Separation of HPCI and RCIC System Initiation Levels-Analysis and Implementation 3.

II.K.3.30 Revised Small Break LOCA methods to show compliance with 1

10CFR50, Appendix K.

The following are our responses:

1.

II.E.4.1 Dedicated H9 Penetrations Boston Edison provided the requested information in Ref-erence (B) under NUREG-0578 Item 2.1.5.a.

2.

II.K.3.13 Separation of HPCI and RCIC Initiation Levels General Electric in association with the BWR Owners Group has developed generic positions for the separation of HPCI and RCIC setpoints, and the restart of RCIC on low level.

BECo intends to adopt the generic Owners Group position follcwing our com-prehensive review of tht position.

Should our review indicate that the Owners Group position can only be adopted in part 0

ve will advise you.

.801007.o M

_g

, SOsTON EDISON COMPANY Mr. D.G. Eisenhut, Director Page 2 October 1, 1980 3.

II.K.3<30 Revised Small Break LOCA As discussed during the September 22, 1980 Region I NRC meeting in Arlington, Virginia, General Electric will provide the NRC with a generic position on this item. BECo will deter-mine the applicability of the position to Pilgrim Station and will advise the NRC of any deviations from the generic pos-ition.

We trust this letter 1. responsive to your requirements, however should you desire additional information or clarification please feel free to contact us.