ML19338E848

From kanterella
Jump to navigation Jump to search
Forwards LER 80-037/03L-0
Date released: 12/18/2019 Download: ML19338E848


LER 80-037/03L-0:on 800903,during Pump Operability test,DHV- 110 Would Not Function as Required.Caused by Electrical Short in Valve Operator Motor.Motor Repaired & Reinstalled. MUV-23 Control Transformer Replaced
ML19338E852
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/26/1980
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338E852 (2)
Forwards LER 80-037/03L-0
ML19338E847
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/01/1980
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19338E847 (1)