ML19338E779
| ML19338E779 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 08/28/1980 |
| From: | Finfrock I JERSEY CENTRAL POWER & LIGHT CO. |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-80-20, NUDOCS 8010060125 | |
| Download: ML19338E779 (1) | |
Text
- _ _.
6 GYSTER CREEK NUCLEAR GENERATING STATION JCP&L GPU
= cen con" 1&,oli fg,sjg (609) 693-1951 P.O. BOX 388
- FORKED RIVER
- 08731 r uu.s saem August 28, 1980 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Region I United States Nuclear Regulatory Coaraission 631 Park Avenue King of Prussia, Pa. 19406
Dear Mr. Grier:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 I. E. Bulletin No. 80-20 An investigation was made concerning the Westinghouse Type W-2 control switches.
It was found out that Oyster Creek Nuclear Generating Station does not use any of the above mentioned swit:hes in any safety related systems.
Two Westinghouse Type "W"
switches were found in a sub-station in the switchyard area.
Since these switches are not Type W-2 and not used on any safety related or in-plant systems, no tests or corrective actions are necessary.
I.
E.
Bulletin No. 80-20 does not apply to Oyster Creek Nuclear Generating Station.
The cumulative manpower expended 'in the preparation of the report totalled 12 manhours.
Since no corrective action is required, no additional time will be expended.
Sincerely, UF)/
'A ' 9 Ivan R. Fin ro, Jr.
Vice Presi ent 4
IRF/sw cc:
NRC Offica of Inspection and Enforcement Division of Reactor Operations Inspection U.
S.
Nuclear Regulatory Commission Washingcon, D.
C.
20555 n,
8 010060 ligt3
.