ML19338E576

From kanterella
Jump to navigation Jump to search
Tech Spec Changes to App A,Table 3.3-5,Pages 3/4 3-27 & 3/4 6-19b Re Initiating Signal & Function Response Time
ML19338E576
Person / Time
Site: Beaver Valley
Issue date: 09/30/1980
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML19338E575 List:
References
NUDOCS 8010030395
Download: ML19338E576 (2)


Text

r

,O' TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 4.

Steam Line Pressure-Low Safety Injection (ECCS) 1 13.0#/23.0##

a.

b.

Reactor Trip (from SI) 1 3.0 c.

Feedwater Isolation 3 75.0(1) 22.0#/33.0##

d.

Containment Isolation-?hase "A" 3

e.

Auxiliary Feedwater Pu=ps Not Applicable f.

RX Plant River Water System 1 77.0#/110##

g.

Steam Line Isolation

< 8.0 5.

Contain=ent Pressure--Hizh-High a.

Containment Quench Spray 1 77.0 b.

Containment Isolation-Phase "3" Not Applicable c.

Control Room Ventilation Isolation 1 22.0#/77.0##

6.

Steam Generator Water Level-High-High a.

Turbine Trip-Reactor Trip 1 2.5 b.

Feedwater Isolation 1 78.0(1) 7.

Containment Pressure-Inter ediate High-High a.

Steam Line Isolation 1 8.0 8.

Steamline P'ressure Rate--High Negative a.

Steamline Isolation 1 8.0 9

1

)

1 BEAVER VALLEY - UNIT 1 3/4 3-27 8010 080'bq(

PROPOSED WORDING i

)

i

)

TABLE 3.6-1 (Continued)

ISOLATION TIME g

VALVE NUMBER TESTABLE DURING (Sec) g INSIDE/0UTSIDE FUNCTION PLANT OPERATION INSIDE/0UTSIDE

[

27.

TV-CV150A Containment Vacuum Pump & 11 Rec mb. Suction Yes N/A 7.5 2

p TV-CV1508

28. MOV-SI842 TV-SI889 SI Accumulator Test Line Yes 15 7.5

'29.

Containment Leakage Monitoring Open Taps Yes N/A

.5 30.

TV-LM100Al Containment Leakage Monitoring Open Taps Yes N/A 5

g 31.

TV-LM100A2 Containment Leakage Monitoring Open Taps Yes N/A 5

g 32.

Containment Leakage Monitoring Open Taps Yes N/A 5

B.

Phase "B" Isolation o

1.

TV-CC103Al TV-CC103A Component Cooling to R.C. Pumps No 20 20 E

2.

TV-CC103B1 TV-CC103B Component Cooling to R.C. Pumps No 20 20 3 R 3.

TV-CC103C1 TV-CC103C Component Cooling to R.C. Pumps No 20 20 M

^

4.

TV-CClllA2 TV-CClllAl Component Cooling to Shroud Coolers Yes 20 20

?

5.

TV-SV100A Main Condenser Ejector Vent Yes N/A 20 5g 6.

TV-CC107D1 TV-CC10702 Component Cooling from R.C. Pumps B&C Thermal Barriers No 20 20 v

7.

TV-CC10501 TV-CC105D2 Component Cooling from R.C. Pumps B&C Motors No 20 20 E

8.

TV-CC107El TV-CC107E2 Component Cooling from R.C. Pump A Thermal Barrier No 10 10 9.

TV-CC105El TV-CC105E2 Component Cooling from R.C. Pump A Motor No 14 14 10.

TV-CC110E3 TV-CC110E2 Air Recirc. Cooling Water - In Yes 30

.30 '

11.

TV-CC110F1 Air Recirc. Cooling Water - Out Yes 30 30 TV-CC1100 TV-CC110F2 12.

TV-CClllD1 TV-CClllD2 Componenti Cooling Water from Shroud Coolers Yes 20 20 13.

M0V-QS101B Quench Spray Pump - Discharge Yes N/A (1)75 14.

MOV-QS101A Quench Spray Pump - Discharge Yes N/A (1)75

  1. 15.

MOV-RSl56B Qutside Recirc. Spray Pump - Discharge Yes N/A (1)75

  1. 16.

MOV-RS156A Qutside Recirc. Spray Pump - Discharge Yes N/A (1)75

  1. 17s M0V-RS155A Outside Recirc. Spray Pump - Suction Yes N/A (1)75
  1. 18.

M0V-RS155B Outside Recirc. Spray Pump - Suction Yes N/A (1)75 '

(l) Maximum openina time.

O