ML19338E565
| ML19338E565 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities, Zion |
| Issue date: | 01/24/1973 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19338E566 | List: |
| References | |
| IEB-72-03, IEB-72-3, NUDOCS 8010030354 | |
| Download: ML19338E565 (1) | |
Text
.
UNITED STATES
[Q).
ATOMIC ENERGY COMMISSION DIR ECTO R # ' 2 OF REGULATORY OPERATIONS
$ fy[y h
j REGION Ill NsO 799 ROOSEVELT ROAD yrt;tpgoyg i
G LEN 8"' LYN. ILLINOIS 6o137 (3I2) e58-2ee0 January 24, 1973 Docket No. 50-10 Cormonwealth Edison Company 50-237 ATTU: Mr. Eyron Lee, Jr.
Assistant to the President 50-249 50-254 P. O. Bor. 767 Chicage, Illinois 60690 50-265 50-295 50-304 Gentlemen:
We have reviewed yeer letter of January 16, 1973, in response to our letter dated December 6, 1972, concerning licitorque valve operator ralfunctions identified in Regulatory Operations Bulletin 72-3.
We have no further questions relative to this matter at the present time.
HovcVer, regarding your letter of January 16, we understand that:
(1) valves in the Dresden Station Unit 1 fitted with SMB-00 and/or S!3-000 operators will receive replacement switches during th(- refueling o. stage currently scheduled to be cocp %ted during June 1973, (2) core co=pletc information is to be available by January 31, 1973, relative to valve operators installed in the Quad-Cities plants, and (3) all valves in the Zion Unit No.'2 plant fitted with SMB-00 and/or SMB-000 valve operators vill receive replacement uvitches by October 21, 1973.
Yo'ur cooperation with us in th!s matter is appreciated.
Sincerely yours, Boyce H. Grier Regional Director bec w/1tr dtd 1-16-72:
R0 Chief, RT&OL RO Chief, RCE RO:HQ (4)
Licensing (4)
ER Centrc1' Files PDR Local PDR NSIC DTIE 4
GC, Beth l
R. Rcrfrow, GC (2) i t
.802oo3g y
..