9-G OYSTER CREEK NUCLEAR GENERATING STATION JCP&L.
GPU
- Mfh8j?0 (609) 693-1951 P.O. BOX 388
- FORKED RIVER
- 08731 EM,w uwe se August 27, 1980 Mr. Boyce H.
Grier, Director Office of Inspection and Enfor,:ement Region I United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa. 19406
Dear Mr. Grier:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 I.
E. Bulletin No. 80-15 In reference to the subject I.E.
Bulletin, the following is our response to certain specific items applicable to Oyster Creek Nuclear Generating Station.
Item 1.
A thorough review of the Emergency Notification System (ENS) by direct inspection and with the telephone company representative, indicates t. a t power to the system is supplied through safety-related busses.
Back-up power is available through the two diesel generators.
The power is therefore solely on site and derived from re-liable power sources.
Item 3.
A loss of offsite power surveillance was cond-ucted prior to this bulletin and it was verified that t'.e diesel generators can supply power to the safety busses.
The ENS was not specifically tested during the loss of power test; however, the power supplies which feed the ENS were shown to be re-powered as required.
Per discussion with the telephone company representative, the ENS will be energized and in operation as soon as power is supplied to it, as mentioned above.
Item 5.
A directive was issued concerning notification of the NRC Operations Center within one (1) hour if any extension of the ENS is found to be in-operable.
Based on the above investigation, no modification to the 1
801003o 309 g
^
w.:..
ENS is necessary at this time for the Oyster Creek Station.
The cumulative manpower (supervision and engineering) required to investigate the ENS and follow-up on the dir-ective totalled 50 manhours.
There will be no corrective manhours expended except for the installation of notices on all extensions of the ENS as indicated on the issued dir-ective.
Sincerely j
fb$
V N
Ivan.R. F nf ek, Jr.
Vice Pre ident IRF/DB:sw cc:
NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection U.
S.
Nuclear Regulatory Commission Washington, D.C.
20555 l