Forwards Insp Rept 50-010/73-06 on 731210-14.Noncompliance Noted
ML19338E160
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/01/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338E166 List:
References
NUDOCS 8009240830
Download: ML19338E160 (2)


See also: IR 05000010/1973006

Text

._

.

.-

=

,

-

'

bR:rac

g,GT r

.p

UNITED STATES

- *

e],

ATOMIC ENERGY COMMISSION

.

J

DIRECTOR ATE OF REGU

ORY OPERATIONS

g

4 rt s M

799 ROOSEVELT ROAD

m

GLEN ELLYN. ILLINOIS 6o137

0 12) 856-2640

WCY

FEB i

1974

Cosmonwealth Edison Company

Docket No. 50-10

ATTN: Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, Illinois 60690

Cent 1==an:

This refers to the inspection conducted by Messrs. F. Maura and C. Brown

of this office on December 10-14, 1973, of operations at Dresden Unit 1

authorized by AEC Operating License No. DPR-2 and to the discussion of

our findings with Mr. W. Worden and members of his staff at the conclusion

of the inspection.

-

A copy of our report of this inspection is enclosed and identifies the areas

====ined during the inspection. Within these areas, the inspection consisted

of a select.ive examination of procedures and representative records, inter-

views with plant personnel, and observations by the inspectors.

The inspection included an summinat"ea of your actions to demonstrate the

isolecion integrity of the off-gas isolation valve identified in our letter

of October 19, 1972. We have no furthar questions on this item at the time.

With regards to the unloading cooling heat exchanger problem identified in

our January 18, 1973, letter as having been referred to our HQ staff, we

note that you have taken corrective action and therefore, we have no further

questions at this time.

During this inspection, it was found that certain of your activities appear

to be in violation of AEC requirements. The item and reference to the

pertinent requirements are listed under Enforcement Action in the Summary

of Findings Section of the enclosed inspection report. Prior to the con-

clusion of the inspection, the inspectors determined that corrective action

had been taken with respect to this violation and that measures have been

taken to assure that a similar, future violatiot. 4111 be avoided. Consequently,

no reply to this letter is required, and we have no further questions

regarding these natters at this time.

~800924 0

]g

.

.

.

.

.

.

.

.

.

causmassaith saison company

-2-

FEB 1

1974

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosso

inspection report will be placed in the AEC's Public Document Room. If this

report contains any information that you or your contractors believe to be

proprietary, it is necessary that you make a written application to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. Any such application must include a

full statement of the reasons for which it is claimed that the information

is proprietary, and should be prepared so the proprietary information identified

in the application in contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in this

paragraph will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely yours,

-

James G. Keppler

Regional Director

Enclosure

RO Inspection Report No.

050-010/73-06

cc

Mr. W. Werden, Dresden

Station Superintendent, w/ enc 1

bec: RO Chief, FS&EB

RO:HQ (4)

Licensing (4)

H R Central Files

RO Files

PDR

Local PDR

NSIC

DTIE

_

.