UNITED STATES
W
_8
'^.
' NUCLEAR REGULATORY COMMISSION
n
j
$
I
.
REGION 11
>
-
101 MARIETT A sT., N.W.. SUITE 3100
'
ATLANTA.GEO9GIA 30;f'M .
--
- JUL 251980
-
In Reply Refer To:
RII:NM
.50-370/80-9
.-
,
3
Duke Power Company .
ATTN:
W. 0. Parker, Jr.
.
!
Vice President, Steam Production
P. O. Box 2178.
Charlotte, NC 28242
Gentlemen:
4
'
This refers = to the inspection conducted by T. D. Gibbons of this office on
,
'
June 24 through 27, 1980 of activities authorized by NRC Construction Permit No.
CPPR-84 for the McGuire facility, . and to the discussion of our findings held
<
-
with T. E. Touchstone at the conclusion of the inspection.
1
Areas examined during the inspection and odr - findings are discussed in the
'
_.
enclosed inspection - report.
Within ' these areas,- the inspection consisted of
selective examinations of procedures and representative records, interviews with
'
personnel, and observations by the inspectors.
,
i_
One new unresolved. item resulted from this inspection and is discussed in the en-
closed report. This item will be examined during subsequent iuspections.
4
During the inspection, it was found that certain activities under your license
1-
appear to be in noncompliance with.NRC requirements. These items and references
to pertinent requirements are listc 1 in the Notice of Violation enclosed herewith
as Appendix A. - TFis notice is'sent to you; pursuant to the provisions of Section
1
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section -2.201 requires you to submit to this office, within 20. days of
your receipt of this n'otice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
t
corrective steps which will'be taken to avoid further noncompliance; and (3) the
,
.
date when full compliance will be achieved.
4
In accordance-with Section 2.790 of the NRC's'" Rules of Practice," Part 2, Title
'10, Code _of Federal Regulations, a copy of this letter and the enclosed inspection
j
- report will be placed in the NRC's_Public Document Room. If this report contains
'
,-
l
any information that you (orzyour contractor) believe to be prop.letary, it is
necessary-that you make a written application within 20 days to this office to
withhold , such information from public disclosure. Any such application must
include a full statement of the reasons on the basis.of which it is claimed that
f
the information is proprietary, and :should be prepared so that pronrietary infor- .
mation identified in the application 'is ' contained in a separate part of the -
' document. _ If we'_d6 'not hear from you in this regard within the specified period,
p
the report will be placed in the Public Document Room.
[
- p
-
S'09240
I
0
.
-
- . .
. - -.
- -
-
.
.
<
,
~.
,
JUL. Illi 1980
' Duke Power Company-
-2--
,
Should you have any questions concerning this letter, we will be~ glad to discuss
them with you.
Sincerely,.
..
"
.
,
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-370/80-9
cc w/ encl:
-M. D. McIntosh, Plant Manager
J. C. Rogers, Project Manager
.
.
4
.