Forwards IE Insp Rept 50-370/80-09 on 800624-27 & Notice of Violation
ML19338D964
Person / Time
Site: Mcguire
Issue date: 07/25/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19338D955 List:
References
NUDOCS 8009240266
Download: ML19338D964 (2)


See also: IR 05000370/1980009

Text

-

- _ , , , . _ _ .

,

,

.

, .

.

_

_

fN

.

_

_,.

J?\\ }-

en: -

r

~ * -.

UNITED STATES

W

_8

'^.

' NUCLEAR REGULATORY COMMISSION

n

j

$

I

.

REGION 11

>

-

101 MARIETT A sT., N.W.. SUITE 3100

'

ATLANTA.GEO9GIA 30;f'M .

--

- JUL 251980

-

In Reply Refer To:

RII:NM

.50-370/80-9

.-

,

3

Duke Power Company .

ATTN:

W. 0. Parker, Jr.

.

!

Vice President, Steam Production

P. O. Box 2178.

Charlotte, NC 28242

Gentlemen:

4

'

This refers = to the inspection conducted by T. D. Gibbons of this office on

,

'

June 24 through 27, 1980 of activities authorized by NRC Construction Permit No.

CPPR-84 for the McGuire facility, . and to the discussion of our findings held

<

-

with T. E. Touchstone at the conclusion of the inspection.

1

Areas examined during the inspection and odr - findings are discussed in the

'

_.

enclosed inspection - report.

Within ' these areas,- the inspection consisted of

selective examinations of procedures and representative records, interviews with

'

personnel, and observations by the inspectors.

,

i_

One new unresolved. item resulted from this inspection and is discussed in the en-

closed report. This item will be examined during subsequent iuspections.

4

During the inspection, it was found that certain activities under your license

1-

appear to be in noncompliance with.NRC requirements. These items and references

to pertinent requirements are listc 1 in the Notice of Violation enclosed herewith

as Appendix A. - TFis notice is'sent to you; pursuant to the provisions of Section

1

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section -2.201 requires you to submit to this office, within 20. days of

your receipt of this n'otice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

t

corrective steps which will'be taken to avoid further noncompliance; and (3) the

,

.

date when full compliance will be achieved.

4

In accordance-with Section 2.790 of the NRC's'" Rules of Practice," Part 2, Title

'10, Code _of Federal Regulations, a copy of this letter and the enclosed inspection

j

report will be placed in the NRC's_Public Document Room. If this report contains

'

,-

l

any information that you (orzyour contractor) believe to be prop.letary, it is

necessary-that you make a written application within 20 days to this office to

withhold , such information from public disclosure. Any such application must

include a full statement of the reasons on the basis.of which it is claimed that

f

the information is proprietary, and :should be prepared so that pronrietary infor- .

mation identified in the application 'is ' contained in a separate part of the -

' document. _ If we'_d6 'not hear from you in this regard within the specified period,

p

the report will be placed in the Public Document Room.

[

p

-

S'09240

I

0

.

-

- . .

. - -.

- -

-

.

.

<

,

~.

,

JUL. Illi 1980

' Duke Power Company-

-2--

,

Should you have any questions concerning this letter, we will be~ glad to discuss

them with you.

Sincerely,.

..

"

.

,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-370/80-9

cc w/ encl:

-M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

.

.

4

.