y) 1 h
- "'a UNITED STATES ut NUCLEAR REGULATORY COMMIS510N y
3 REGloN W 3
f 799 ROC 5EVELT ROAD
/
GLEN ELLYN. ILUNoIS 60137 SEP - 8 Ga0 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post Of fice Box 5000 Cleveland, OH 44101 Gentlemen:
Thank you for your final report dated August 26, 1980, pursuant to 10 CFR 50.55(e) regarding Post-LOCA H Analyzers. We will complete 2
our review of this matter during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
/%
W G. Fiorelli, Chief Reactor Construction and Engineering Support Branch i
cc: Director, RCI/II Director, AEOD Chief, OEB/MPA IE Files cc w/ltr dtd 8/26/80:
Central Files PDR Local PDR NSIC Harold W. Kohn, Power Sicing Commission Mr. Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio 8009240 1
~
9temuc ILLUMiN ATING SLOG. e PUSLIC Sou#Rt a CLEVELAND. oMio 44101 e TELEPMONE (216) 8231350 e MAIL ADDRtSS P o. SCx $o00
,.- i
- y :-
Datwyn R. Davidson vict ent 5 Ot NT 5'$'t w IN". NE Emo a%: CC 2.<8 vCt:oq August 26, 1980 Mr. James G. Keppler DTrector Regior Ill Of fice of Inspection and Enforcement
$-N[M U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Re:
Perry Nuclear Power Plant Final Report on
Dear Mr. Keppler:
Post-LOCA H Analyzers y
This letter is the final report on the deficiency concerning Post-LOCA H, j
Analyzers required by 10CFR50.55(e). This problem was first identified to Mr. Jack Hughes of the NRC Region III, Of fice of Inspection and Enforcement on April 22, 1980, by Mr. M. R. Edelman of The Cleveland Electric Illuminating i
l Company. Additionally, an interim report dated May 22, 1980, was sent to you documenting the problem and the course of action to be taken.
Description of Deficienev The Cleveland Electric Illuminating Company avarded a contract to Comsip Incorporated for the design, f abrication, ass.mbly, testing, inspection and j
delivery of the hydrogen analyzer systems for the Perry Nuclear Power Plant-Units 1 and 2.
During a functional testing of one of the units, a pump failed i
because one of the panel outlet v Ives was closed when the pump was started.
This design did not consider that excessive outlet pressure of the sample pump could cause mechanical separation of the connecting rod and crank shaf t, which in turn, could rupture the pump diaphragm.
<l An,1ysis of Safety Implication In our interim report, dated May 22, 1980, we identified two (2) potential safety hazards:
1.
Up to one (1) liter of containment gas could be released into the outside atmosphere, should the failure as defined above occur; and/or 2.
If the input / outlet valve is closed while the pump is in operation or if the containment isolat!
valve inside the containment is closed, there is a risk in damaging the system, thereby rendering the system inoperable.
kg01996 DUPLICATE DOCUMENT Entire document previously entered into system under:
ANO 9&9QSD M No. of pages:
S T
.