Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20149F8331994-08-18018 August 1994 Forwards Info Received from Constituent WR Ripley Re Difficulty W/Info Concerning Nuclear Fuel Reprocessing Plant at Barnwell,Sc,For Response ML20096F0981992-05-12012 May 1992 Ack Receipt of Re NRC Pending Decision of Barnwell Nuclear Fuel Plant,Barnwell,Sc.Licensee Does Not Intend to Provide Addl Info in Support of Request for Continuation of Construction Permit CPCSF-4 ML20082B9251991-07-11011 July 1991 Forwards Corrections & Clarifications of Several Factual Matters in Commission Paper SECY-91-021 Re Const License for Barnwell Nuclear Fuel Plant,Per Allied-General Nuclear Svcs Exam of Documents Transmitted by NRC ML20070P9001991-03-21021 March 1991 Responds to 910228 Request for Addl Info Re Consequences of Extending CP CPCFS-4.Vendor Does Not Intend to Pursue Const Activities at Present Time.Possible Sale/Transfer of Facility to DOE or Govt Contractors Discussed ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20055G5181990-07-19019 July 1990 Forwards Ltr from Allied-General Nuclear Svcs Re CP CPCSF-4 ML20055G5831990-07-11011 July 1990 Requests Further Extension Until 930930 or Earlier as Result of Various Uncertainties Existing Re Nuclear Waste Program Including Govt Plans in Area of Savannah River Plant ML20147F5551987-11-16016 November 1987 Expresses Disappointment W/Nrc Decision to Adopt Rule Change Re Licensing of Nuclear Power Plant W/O Participation of State & Local Govts in Emergency Evacuation Planning. Served on 871201 ML20237L3851987-08-25025 August 1987 Forwards from Allied-General Nuclear Svcs Re Status of CP for Plant Separations Facility ML20237L4141987-08-20020 August 1987 Requests That Further Extension Be Granted to 900930 for Completion of Const ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20215L2441987-03-25025 March 1987 Informs That AF Ritardi Replaced Cl Tuch as Official Contact on Matters Re CPCSF-4.AF Ritardi Address Listed ML20235F1741987-01-21021 January 1987 Submits New Mailing Address for All Correspondence Re Facility Due to Author Retirement ML20209E3511986-08-0505 August 1986 Forwards Notice of Name Change of Partners in Valley Pines Assoc Re Separations Facility at Barnwell Nuclear Fuel Plant ML20097G2571984-08-20020 August 1984 Forwards Allied-General Nuclear Svcs Re Status of CP for Separations Facility of Barnwell Nuclear Fuel Plant ML20097G2761984-08-15015 August 1984 Requests Extension Until 870930 for Const Completion. Extension Requested Based on Chem Nuclear Desire to Purchase Strip of Property ML20090H8341984-04-0202 April 1984 Forwards Remaining Info Required for Amend of State Matls License,For Possession Only ML20084R6871984-03-30030 March 1984 Advises That Effective 840330 Author,Will Be Retiring from Allied General Nuclear Svcs.After 840330,correspondence Should Be Addressed to C Nielsen,Vice President,Allied Chemical Nuclear Products,Inc ML20088A4771984-01-26026 January 1984 Forwards Consultant Final Rept:Barnwell Nuclear Fuel Plant Decommissioning Project & Rept of Radiological Overview Survey for Barnwell Nuclear Fuel Plant Decommissioning Project. Matls Inventory Also Encl ML20083H0221983-12-14014 December 1983 Responds to IE Bulletin 83-07 & 83-07,Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed in safety-related Sys at Facility ML20083H1411983-12-13013 December 1983 Forwards Application to Amend State of Sc Radioactive Matls License 144 & to DOE Summarizing Current Status of Shutdown Activities ML20083G7291983-12-13013 December 1983 Responds to IE Bulletin 83-07 & 83-07 Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed at Facility.Matl in Stock Identified,Isolated & Tagged B10639, Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 8304031983-01-21021 January 1983 Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 830403 ML20028C6411982-12-0303 December 1982 Informs That Partnership Name of Ga Co Changed to Valley Pine Associates.Certified Copy of Filing & Affidavit Encl ML20070A9601982-11-17017 November 1982 Ack Receipt of IE Insp Rept 50-332/82-03.No Proprietary Info ML20027A9461982-08-30030 August 1982 Ack Receipt of IE Insp Rept 50-332/82-02.No Proprietary Info ML20065C2301982-08-16016 August 1982 Requests Extension of Const Completion Date Until 830930 ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20039C8401981-11-23023 November 1981 Requests Extension Until 820930 of Completion Date for Facility.No Action Was Taken by Commission on 781109 Request for Extension to 811231 ML19353A3401980-12-10010 December 1980 Ack Receipt of IE Insp Rept 50-332/80-03 on 801015-17.No Proprietary Info ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B5691980-10-10010 October 1980 Submits Comments on Resumption of Gesmo Rulemaking on Behalf of Az Public Svc Co,Cp&L,Con Ed & Wi Electric Power Co. Proceeding Would Provide Factual Basis on Which NRC Could Render Independent Judgment on Urgently Needed Issues ML19347C1491980-10-0808 October 1980 Supports Resumption of Gesmo Proceeding as Prelude to Closure of Nuclear Fuel Cycle ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19338E6241980-09-30030 September 1980 Responds to Commission 800807 Order Requesting Comments on Reopening of Gesmo & Other recycle-related Licensing Proceedings.Proceedings Should Be Reactivated & Consistent Position on Use of Energy Initiated ML19295A6331980-09-29029 September 1980 Comments on Rulemaking 50-5:GESMO Proceeding Should Be Rescheduled ML19295A6351980-09-29029 September 1980 Forwards Comments on Behalf of NRDC on Rulemaking 50-5:GESMO Proceedings Should Not Be Reopened ML19337B2671980-09-29029 September 1980 Forwards Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reinstitution of Hearing Reflects Us Interest in Energy Need & Will Establish Framework for Timely Decisions on Reprocessing & Recycling ML19337B2691980-09-26026 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:no Further Action Needed Due to Completion of Evidence ML19338E9941980-09-26026 September 1980 Comments on Rulemaking 50-5 Re Reopening of Gesmo & Recycle Related Proceedings.Reopening Record Will Resolve Economic, Environ & Resource Questions Re Fuel Reprocessing ML19338E6321980-09-26026 September 1980 Recommends Reopening of Gesmo Proceedings ML19337B2681980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:continuation of Review Process Needed to Determine Whether Reprocessing & Recycling Is Viable Option ML19337B3191980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:hearing Must Be Reopened Promptly Due to Need for Establishing Legal & Logical Basis for Evaluation of Spent Fuel Reprocessing ML19295A6411980-09-23023 September 1980 Recommends Resumption of Gesmo Proceedings.Persian Gulf Area Warfare Necessitates Technical Development of Spent Reactor Fuels to Lessen Dependence on Imported Oil ML19337B2721980-09-23023 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reopening & Successful Completion of Hearing Is Logical Precedent to Commercial Reprocessing of Spent Nuclear Fuel ML19336A3731980-09-17017 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Draft Article Encl Which Should Have Some Input in Forming Policy on Recycling Pu ML19338D2671980-09-15015 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Technical,Economic & Safety Issues Must Be Addressed in Order for Decisions to Be Made Re Use of mixed- Oxide Fuels ML20040C5131980-09-15015 September 1980 Reiterates 790201 Request That Environmetalist,Inc Be Informed of All Matters Re Barnwell Nuclear Fuel Plant & Barnwell Nuclear Fuel Receiving & Storage Station 1994-09-07
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted 1982-06-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19261D1161979-04-16016 April 1979 Responds to Describing Unsuccessful Efforts of Group to Be Included in Facility Tour.Tour Was Not Part of NRC Review in Proceedings ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted ML20210A8121974-05-0909 May 1974 Forwards List of Licensed Facilities for Processing & Reprocessing Pu & Pending Applications Per 740328 Request. List of Sites W/Plans for Similar Facilities & Licensees Authorized to Possess Pu for Specified Purposes Also Encl 1994-09-07
[Table view] |
Text
(
9 km Mo
+
UNITED STATES 8'
NUCLEAR REGULATORY COMMISSION o
r REGION il j,
5 o,
(f 101 MARIETTA ST N.W.. SulTE 3100 b
, ATLANTA, GEORGIA 30303 o
' 7 AUG 211980 1
In Reply Refer To:
RII:JPO OTJ Allied-General Nuclear Services Attn:
R. B. Holden, President P. O. Box 847 Barnwell, SC 29812 Gentlemen:
The enclosed IE Circular No. 80-20 is forwarded for your information. If there are any questions related to the suggested actions, please contact this office.
Sincerely, G
e James P. O'Reilly Director
Enclosures:
1.
IE Circular No. 80-20 2.
List of Recently Issued IE Circulars
+
E
. e
?
s I
r r
g
[
)L i
g
p-
=
.c SSINS:.6830 Acce7sica Na.':
8006190036 IEC 80-20
. UNITED STATES NUCI. EAR REGULATORY COMMISSION T
D
- S 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555
August 21, 1980 IE Circular No. 80-20: CHANGES IN SAFE-SLAB TANK DIMENSIONS Description of Circumstances:
During a routine-inspection at a' fuel facility, an NRC inspector received a report of significant dimensional changes in safe geometry tanks. The tanks were used to store low-enriched uranium solutions from a scrap dissolver. The problem was first identified when a sight-glass mounted on the large face of one of three safe-slab tanks cracked from the strain of tank dimensional changes. Further investigation and measurements revealed that the large faces of two of the tanks had bulged and increased the thickness dimensions of the tanks.
The maximum bulge occurred at the center of one of the tanks, increasing the tank thickness 2 1/2 in beyond the design thickness of 5 1/2 in.
The bulge tapered from the tank centers to the designed 5 1/2 in, at the tank edges.
The tanks were made of 1/8-in. type 304 stainless steel with the tank edges and_large faces supported and stiffened by 3/16-in. angle iron.
The cause of the bulging wa.s believed to be overpressurization due to partial plugging'of the tank vent lines. Contributing factors may have been excessive transfer rates, metal fatigue aggravated by corrosion, and the high specific gravity of the stored solution.
i l-Replacement tanks were provided with tie-bars _and heavier 1/4-in. angle iron stiffeners to preserve the thickness dimensions.
Conservative calculations,
~ taking into account the weight of solution, tank dimensions, and tie-bar and stiffener strength, indicated that required dimensions would be maintained. A precondition for the calculations required that the tank vent system be designed to prevent accidental pressurization.
To prevent accidental. pressurization, a 1-1/2-in. overflow line was connected to the 1-1/2-in. vent line to the process offgas (POG) system at a point immediately above each tank. This provided a positive overflow as well as a second vent'in case a plug occurred in the main POG line. Additionally, each tank was provided with a 2" x 4" inspection port at the top with a cover free to " float" should pressurization. occur.
The tank dimensions were approximately 62" x 62" x 5 1/2".
The tank locations were parallel to and about 1 ft removed from the scrap recovery area walls.
^ _The visual detection of the 2-1/2-in. deflection of the large tank face from a point in front of the tank is usually difficult so that measurements should b.e,
made with calipers or similar equipment to assure detection of significant distortion.
U
.y IEC 80-20 August' 21, 1980 Pcg2 2 cf 2 Notice to Licensees:
All' licensees using safe-slab' tanks should be aware of the possible changes in tank dimensions resulting from hydraulic or pneumatic forces.
Certain steps should be taken to prevent or detect changes in safe-slab tank dimensions.
These actionsfinclude the following:
(1) Structural analyses should be reviewed for all vessels designed to be s
geometrically safe to assure that the possibility of preseurization has been adequately considered. The use of tie-bars and rigid steel supports should be considered in designs for new tanks.
(2) The possibility of vent lines becoming plugged should be studied and special overflow mechanisms c'muld be provided if pressurization by vent line plugging is possible.
(3) Provision should be made for roscine dimensional checks of geometrically safe vessels. These checks shotld be made whether or not the vessels are subject to pressurization.
No writtsu response to this circular is required.
If additional information regarding this subject is required, contact the Director of this office.
+
4
. 6 &'.
4;& - mJ.-.
c 2 m, _ A
= -- - - -- --
.--~o-.-
IEC 80-20 August 21, 1980 S
RECENTLY ISSUED IE CIRCULARS Circular Date of
'No.
Subject Issue Issued to 80-20 Changes in Safe-Slab 8/21/80 All Part 50 and Part Tank Dimensions 70 Fuel Facility e-Licensees 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR Jet from Baffle Plate Corner OLs and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510DU Trip facilities with an Units And Model 1152 Pressure OL or a CP Transmitters 80-15 Losa of Reactor Coolant Pump 6/20/80 All power reactor l
Cooling and Natural Circula-facilities with an tion Cooldown OL or CP 80-14 Radirective Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor System and Resultant Internal licenses (operating Contamination of Personnel and construction.
permits), and fuel cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12'
_ Valve-Shaft-To-Actuator Key 5/14/80 All holders of reactor May Fall Out of Place When
'OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP 80-10
. Failure to Maintain 4/29/80 All holders of reactor Envirr" mental Qualification OLs and cps of Eqaipment 80-09_
Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP
.Jt c-