ML19338D502
| ML19338D502 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/09/1980 |
| From: | Neufer A VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML19338D500 | List: |
| References | |
| NUDOCS 8009230360 | |
| Download: ML19338D502 (2) | |
Text
A N
q DOCKET NO.-
50-339 UNITSilUTDOWNS AND POWER REDUCTIONS UNIT N AME North Anna 2 DATE 09-09-80 COMPLETED BY A.G. Neufer REPORT MONTil August TELEPilONE 703/894-5151 k
E; "E
5 Yb Licensee En Cause & Corrective No.
Date h
j$
)jM y
Action to Event F-yI 5
j f3 Report #
mV Prevent Recurrence g
6 Ini ti,11 Power Gcn trati on begin i 08.'S-80 a:
0547.
(Not commerc ial) 80-01 80-08-2G F
18.1 H*
3 rurbinc Trip /Raactor Trip when gencrato
?>reaker was oponcd. Placed recorders
)n Rcactor Protccc1ca Circuits to tracc
- auso.
80-02 80-08-27 F
2.4 H*
3 ruthina Trip /Rcactor Trip when Overspee
'rotection Controller was activated luring test.
80-03 80-08-28 F
2.0 A*
3 itcam Generator Lc Level Reactor Trip
- auscd by loss of ccedwater Flow when
- ondensate Pump Suction Straincts were c
logged up.
C1 caned Strainers.
co N*
80-04 80-08-28 F
79.5 D
1 WR/RO 80-51 till Valvox init Shutdown to comply with Technical n
1pecifications TS 3.G.3.1 Fccdwater/
O u
- ontainment Penetration Isolation.
1-2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data D Maintenance of Test 2 Manual Scram.
~
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LI R) File (NURI:G-D-Regulatory Restriction 4-Other (IIxplain) 01611
')
E-Operator Training & Ucense Examination
~ - -
F Administrative 5
_ -(
H j
G-Operational Error (Explain)
Exhibit 1 - Same Source 19/77)
Il-Other (Explain)
- Sce attached sheet
U) 50-339 DOCKET NO.
UNITSHUTDOWNS AND POhER REDUCTIONS N rth Anna 2 UNIT NAME DATE 09-09-s0 COMPLE11?D fly A.G.Neufer REPORT MONTil August TELEPHONE 703/894-5151
/
"L.
.E g 3
Y Licensee
$+s;,
h".,
Cause & Corrective No.
Date g
5g n
jse Event p
g Action to H
yI s
j g, Report st wU Present Recurrence g
c5 80-04 F
Conti ques ehrough end of month.
Shut Down I
2 3
4 F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) 1-Mamsal for Preparation of Data 13-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (LI R) File (NURl(G.
D. Regulatory Restriction 4-Other (Explain) 0161) l E. Operator Training & License Examination F Administrative S
G-Operational Error (Explain)
Exhibit 1 - Same Source (9/77)
Il Oth:r (Explain)
I s