ML19338D438

From kanterella
Jump to navigation Jump to search
Requests That All Personnel Be Reminded of Purpose of Emergency Notification Sys & Health Physics Network.Sys Installed for Govt Use During Emergency
ML19338D438
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/22/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8009230199
Download: ML19338D438 (3)


Text

f

^

s

%[.

UNITED STATES

> ~

A NUCLEAR REGULATORY COMMisslON

-4

.f h

REGION I tA 2-631 PARK AVENUE.

KING OF PRUSSI A, PENNSYLVANI A 19406

~ August 22, 1980 Docket No. 50-271.

~ Vermont Yankee Nuclear Powce Corporation ATTN:

Mr. Robert L. Smith.

Licensing Engin~eer 25 Research Drive

.Westborough, Massachusetts 01581 Gentlemen:

This letter is forwarded'to you to bring to your attention the purpose of the two direct and dedicated telephone networks, i.e., Health Physics Network (HPN) and Emergency Notification System (ENS). These systems were installed for government use during an emergency.

It should be emphasized that. the HPN, however, is to be used by you only if you need to reach the NRC and the Emergency Notification System (" hot line") and the commercial systems are not operational or available.

Please remind all personnel of the stated purpose of these systems.

~ Sincerely, Wh Ys oyce H. Grier

' ector

Enclosure:

Description of ENS and HPN

' ' ' ~

cc w/ encl:

Mr. Warren P. Murphy, Plant Superintendent 4

Mr. W. F. Conway, Vice President and Manager of Operations

.r.

Mr. J. E. Griffin, President Mr. L.11. Heider, Vice President v.

80LO92$08I F

7

. 7,. e.

Emergency Noti ication System

. ENS -

h

Purpose:

The ENS is intended for use as the primary means for the site to report emergencies and other significant events to NRC/IE Headquarters.

When the NRC Operations Center is activated in response to a site emergency, the ENS

~

becomes the dedicated and continuous line to the NRC for the transmission of operational data.

Use: Whenever there is a site event of the type specified in Title 10, code of Federal Regulations, Section 50.72, each licensee is required to report the.in-cident and status of the plant to the NRC as outlined in the referenced section.

The ENS is the means for reporting the situation to the NRC.

To activate the ENS, the licensee employee needs only to lift the receiver. This causes the telephone console in the Operations Center in Bethesda, Maryland to ring automatically.

Requirements:

If the incident has little potential for impacting the public health and safety, the NRC Duty Officer may caly collect relevant infomation and then terminate the conversation.

However, if the, event is of a more s'erious nature, the Duty Officer will maintain an open and continuous line with the sita until the matter is resolved.

Licensees are required to assign an individual to maintain continuous communication with the NRC staff member in the Operations Center until the NRC decides that the etent has been successfully-tenninated or additional consnunication is unnecessary.

Ib 3

s

\\

_1

]

r-i t

5 Health Physics ~ Network LHPNL

Purpose:

The HPN is intended for use as the. dedicated line between the NRC Headquarters and the site for health physics data during site emergencies and other significant events. The usual locations for this network are:

Licensee's Health Physics Office Emergency Operations Facility (EOF)

Alternate E0F Resident Inspector's Office Use: During an incident, NRC Headquarters will establish this telephone link using the HPN. Before NRC health physics specialists arrive at the site, the NRC Operations Center communicator may request information from licensee personnel.

Requirements: The HPN should be used for reporting emergencies only after the utility has been unsuccessful at contacting the NRC using the ENS and commercial telephone lines.

NRC Headquarters can be contacted on the HPN Network by dialing "22".

e e

i