ML19338D407
| ML19338D407 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/29/1980 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | ALABAMA POWER CO. |
| Shared Package | |
| ML19338D405 | List: |
| References | |
| NUDOCS 8009230117 | |
| Download: ML19338D407 (6) | |
Text
'
- j. _
1 f'
~
es,...;w y:_
y :4 -
^
'A
.q.y
~
UNITED STATES OF' AMERICA'-
NUCLEAR REGULATORY COMMISSION'
~
.)-
In the Matter.of--
ALABAMAPOWERiC0WANY..'
)-
' (Joseph M.- Farley Nuclear Plant,
- )
Docket No. 50-348'
- Unit' No.- 1).
)
x
.' ORDER :FOR MODIFICATION OF LICENSE ~
- ^;
b
'I.
Alabama Power Conpany, L(the. li'censee)-.is the holder of License _No. 'NPF-2, which authorizes' the operation of the Joseph M. Farley Nuclear Power Plant, Unit No~.11 at steady state _ reactor. power levels not -in excess of 2652 mega-watts. thermal (rated-power).
The facility consists of a pressurized water 1
-reactor loca' ed at the. licensee's site in Houston County near the City of Dothan,7 Alabama.
II.
On November '4,1.977, the Union of Concerned Scientists (UCS) filed with the Comission a " Petition for Emergency and Remedial Relief." The petition sought ~ action in two areas:
fire-protectionifor electrical-cables, and environmental qualification of electrical. components. -By Memorandum and Order ~ dated April 13,1978 l(7 NRC_400), the Comission
- ordered the NRC staff to-take several related actions.
UCS. filed a Petition for Reconsideration on May 2, -1978. By Memorandum and-Order, dated May-23,il980, the Comission. reaffirmed its April 13,1978 decision I
l 1800923.o..llE.
q
-<an'e._...
t.
p.-
s.
- 2 '-
O regarding the possible shutdown'of operating reactors. However,sthe-
~
~
Comission's MayL23, l980-decision -directed licensees ~.and the NRC staff -
~ to undertake' certain ' actions.
With~res'pect to environmental qualification of safety-related electrical p
equipment :the Comission determined that the provisions of the two staff documents'- the Division of Operating Reactors " Guidelines for
' Evaluating Environmental Qualification of Class lE Electrical Equipment-in _0perating Reactors" (00R Guidelines) and NUREG-0588, " Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equ.ipment," December 1979 "fo;m'the requirements which licensees and applicants must meet in order to satisfy those aspects.of 10 CFR Part
.50,. Appendix A General Design Criterion (GDC-4), which relate to environ ~
mental qualification lof safety-related electrical equipment." The
~
Comission directed, for replacement parts in operating plants, "unless there are sound-reasons to the contrary, the.1974 standard in NUREG-0588 4
will apply." The Comission also directed the staff to. complete its 1
review of the information sought from' licensees by Bulletin 79-018 and' to complete its review of environmental qualification of' safety-related
,y
. electrical. equipment in all operating plants, including the publication
-of Safety Evaluation Reports, by February 1,1981.
The Comission 1-Bulletin:79-01B was not sent to licensees for. plants under review as part of the staff's Systematic Evaluation Program.
The~information
-sought by Bulletin 79-01B was requested from these licensees by a series of. letters' and meetings during the months of February and March,.
- 1980.
a-t
'k
sm_
.. v w,-.
W..-'s, p.
GSw di, O n :
+% +;nn w nw
,,r,
an -
z
%.,a*mg:p
,4f qm 7v
_.w:giy_ ~ ' -.
e 4
'. o
_c,
~ ', L ;J v: - er qg % %
7; my ' '
. ~,'
, Q3*
+; 3- _ ;;n t',
ty: ; my' s
+
gwm
,_yt
, ;hw:sp L
}.
1 -%,
wym s.
o._,.
2 4
>. < w y; p gl-; Q y. Q
. y
}lif ::,
%g
[s,s
- 3 pQ n :
f f
~
l.
[ jf
,,3^ ~ j;.
~
4 w~
4
,._,Nm_
_m-
.m s
~
3 '.
't
<.%T 4
w:&'
7
+
r 3
a.
- ?
-9 p
",n' 7
7
?
?imposedialdeadlinef that',{"by, no later thanJune.30,;1982 f allJsafety-:
,.m..
s
,r~
s
- m. m..
a 3relatedEelsctricaljeq'fpmentiin'allLoperating'plantsishall;be; qualified
~
7.
u
( '-
A
. A d.,
lto$thEDOR.IGu'idelines-or NUREG-0588." <Theicomidsion requested the; n.
~ '
r.
2
~
s
.: staff. to? " keep)the Csmission L and the Lpublic. appri sed Johanylfurther' r,
. i.
[
Efin_ ings; oflincondlete^erivironmentaliqualification of. safety-relatehi
~
d
~
telectrical. eqiihment,halong withicorrective actions.taken;or: planned,"-
m-A and. requested theistaff to5 provide':bi-monthly progress reports to the l
Comission.
+
~ The$ bmission further directed the.s'taff to add certain documentation -
C
' ~. ; ;
~
- requirements to each/ license after-the specific requirements.were approved
~
~
by, the Comission.- The Comission also pointed out that the. various deadlines; imposed in its ' Order,< "do not excuse > a licensee:from the
~
obligation:to' modify 'or) replace inadeguate equipment promptly."
r
.A/.
III..
a
- The informationl developed dt ring this proceeding emphasizes the,importance g
- b
~of ' adequate: documentation, the. prompt completion ofithe Lreview of environ-($e'nta'lLqualificatio.n,ofEsafety-related electrical equipment, and the-4:
g -
prompticompletionLoflany plant mo'dificationoneeded to assure conformance.
fsithdheIDOR; Guidelines-orgNUREG-0588.lAlsigniff_cantaspect'ofthis-review
~ v
[
6 fis[thdtimelyisiibmitta1Iof' environmentalfqsalification information by
.9'm ithe; operating:plantnlice. sees-to enable-the; staff to conplete;its revier
,m
~,
~
iiniaccordancelwith4 the Cosmission's10rder. DThe staff hasia program -
S'
...r.
y. ;
3 g
W.
r 1 4 -
~
Ml 7 7presentlyfunderway3 tojeevaluatieCusing the DORTGuidelines' aad NUREG-
- -x
~
n; f&
N 05882isefquali fica'tionstof(safety-related e el_ectriwl - equipment-exposed
~
.t
^ +:
~
2n
~
9,
.SO li.;,_
- f 2
-m-r c
~m
- .m 9 p m,.
- . ~
i. -M -n . s,2% l-hS$Yf .h !['f ' -j e c.,x ~ ' a,; (( s ~ c f. -4 :.. 9 - + to environments that. may exist following postulated accidents. These. m accidents are Loss ofloolant: Accident and Main Steam Line Break' inside containment, Jand High Energy LinefBreaks inside and outside containment. In this connection the licensee was requested by I&E.Bulletin 79-018 of Januaryf14,.1980 to provide a deta'iled review of the environmental ' qualification ~ of Class lE electrical equipment. This review was to include - all equipment required to function under postulated accident' conditions, both inside and outside the primary containment, and recognize' all condi- ~ tions specified in the bulletin. Evidence of qualification together with methods and justification. -was requested. Clarification was provided by supplemental information,- briefings, and in some cases, meetings with the licensee. Timely completion of the staff's review of environmental qualification of electrical equipment and timely completion of needed modifications by ~the licensee is required to provide continuing reasonable assurance of public health and ' safety. Such conpletion is dependent on the pronpt receipt of a conplete response by the licentae to the staff's requests for. information. However, the licensee's response, to date, is incomplete. Therefore,11 have concluded that the public health, safety,. and interest require.that a firm schedule for the timely submission of all the information'previously requested.by the staff should be established - by Order effebtive immediately. t g. ~ a -m s p y,, y n 9.- rt e-r ^ ~ u .. h,,, i.. 9 ~ -5. IV. Accordingly, pursuant'.t'o the Atomic' Energy Act _of 195'4,. as. amended, and-- the Comission'sfregulations-in 10lCFR Parts 2.and 50,i!T IS ORDERED ' THAT EFFECTIVE IMMEDIATELY-Facility Operating License No. iNPF-2 is hereby amended to: add the following provisions: "Information which' fully and completely responds to the staff's request as specified above, shall be ' submitted to the Director, Division of Licensing-by the licensee not later than November _ l, 1980." An earlier response is encouraged to-facilitate staff review and issuance of the-safety. evaluation report. The licensee or any person whose interest may.be-affected by this Order may request a hearing within 20 days of the date of this_ Order. Any request for a hearing will not_ stay the effactive date of this Order. Any request for a hearing shall be addressed to the Director,:0ffice of. Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D. C. 20555. A copy of the request should also be sent-to the Executive Legal Director, U. S. - Nuclear Regulatory Comission, Washi of.in, D. C. 20555, and to-George F. Trowbridge,. Esquire, Shaw, Pittman, Potts-and Trowbridge, -1800 M- ' Street, N.W.,= Washington, D. C. 20036, attorney for the licensee. If a hearing is held concerning this Order, the issue to be. considered at the1 hearing shall 'be whether the license sh'ould be modified to _ require submissi. n-of information as set forth in Section IV. of the Order. o l. m EL t i ~, - ..~- .J %.. L. ; 6- _0perating.of the. facility.on_ terms consistent:with this'0rder.'is not ~ =s -stayed by the pendency-of any-proceeding's on the Order.- .FOR~THE: NUCLEAR REGULATORY.' COMMISSION .c 'l : _ _U_@ ITarrell G. - g senhut, Director Division of. Licensing Effective Date:- Adgust 129, _1980 Bethesda, _ Maryland f s n I.