Submits Supplemental Response to IE Bulletin 79-18.Design Change to Provide Visual Evacuation Signal in Diesel Generator Rooms Will Be Completed by 800930
ML19338D396
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/21/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
655C, IEB-79-18, NUDOCS 8009230097
Download: ML19338D396 (1)


Text

'

b USNRC m 'N T,

c:

VIRGINIA EIacrBIC AND Powpur,ePA s s.

Ricwwoxx>,V2 morn xA 20261 August 21,I98i8 AS: 57 Mr. James P. O'Reilly, Director.

Serial No. 655C Office of Inspection 'and Enforcement N0/RMT:ms U.S. Nuclear Regulatory Commission DocketNo.d-338)

' Region II License No. NFi--4 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

1

SUBJECT:

IE BULLETIN 79-18 SUPPLEMENTAL RESPONSE This is co provide - supplementary information to our letter of September 24, 1979 (Serial No. 655) in response to IE Pulletin 79-18, " Audibility Problems Encountered in Evacuation of Personnel From High-Noise Areas" for North Anna Power Station Unit No. 1.

1.

In our previous response it was stated that " Current alarm systems and evacuation announcement systems..." were clearly audible in all areas except the diesel generator' rooms when the diesels are operat-ing.

The wording of this statement may. lead to confusion and, therefore, needs clarification.

The fire alarm and the evacuation alarm have been. determined to be. clearly audible in all areas of the station except' the diesel generator rooms when the diesels are operating.

Personnel are instructed as part of general training to evacuate the station immediately upon hearing the evacuation alarm.. Therefore, an announcement is not necessary to - initiate evacuation.

2.

The design change to provide a visual evacuation signal in the diesel generator rooms is presently being. installed.

This instal-lation will be completed by September 30, 1980.

As an interim measure, administrative controls have been implemented to insure the evacuation of the diesel generator room if required.

Very truly yours, B. R. Sylvia Manager - Nuclear Operations and Maintenance cc: Direttor,. 0ffice of Inspection and Enforcement

'Did sion of Reactor Operations Inspection fd.S. Nuclear Regulatory Commission Washington, D.C.

20555

OIG4CIAL Cone h 8U O'S 23~0097 p

-