Forwards Insp Repts 50-010/73-05,50-237/73-06 & 50-249/73-07 on 731113-16.No Noncompliance Noted
ML19338D011
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/11/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19338D013 List:
References
NUDOCS 8009150624
Download: ML19338D011 (2)


See also: IR 05000010/1973005

Text

-.

..

- .

g/ .

.

.

[ ,... ,

.

'

UNITED STATES

j

'

D.

ATOMIC ENERGY COMMISSION

.

e

k*o

\\ '

DIRECTORATE OF REGULATORY OPERATIONS

REGION lit

is o'

799 ROOSEVELT ROAD

-

.

GLEN ELLYN, ILLINOIS 60137

(312) ess.2sso

.

.

JAN 1 1 1974

Commonwealth Edison Company

Docket No. 50-10

ATTN

Mr. Byron Lee, Jr.

Docket No. 50-237

Vice President

Docket No. 50-249

P. O. Box 767

Chicago, Illinois

60690

Centlement

This refers to the inspection conducted by Mr. Lonergan of this office on

November 13-16, 1973, of activities at the Dresden Nuclear Power Station

authorized by AEC Operating Licknees DPR-2, DPR-19, and DPR-25 and to the

discussion held with Messrs. Morris, Pavlick and Williams of your staff

at the conclusion of the inspection.

A copy of our report of This inspection is enclosed and identifies the areas

=== mined during the inspection. Within these areas, the inspection consisted

of a selective summination of procedures and representative records, inter-

views with plant and offsite personnel, and observations by the inspector.

-

No violations of AEC requirements were identified within the reope of this

inspection. However, certain items in the Dresden Station Faergency Plan

were identified as needing further resolution. These iteria are contained

in Paragraphs 3, 5, 6.a, 6.b, 7 and 8 of the Report Details Section of the

enclosed inspection report.

It is our understanding that appropriate

action will be taken to resolve these matters. We will examine these actions

during a subsequent inspection.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this lettar and the

enclosed inspection report will be placed in the AEC's Public Document Room.

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written application to

this offiae, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. Any such application must include

i

a full statsamnt of the reasons for which it is claimed that the information

(

is proprietary, and should be prepared so the proprietary information

identified in the application is contained in a separate part of the docu-

ment. Unless we receive an application to withhold information or are

otherwise contacted within the specified time period, the written material

identified in this paragraph will be placed in the Public Document Room.

.

i

1

'

i

,

.

0

J..

1

~

.

Commonwealth Edison Company

-2-

.

.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely yours,

James C. Kappler

Regional Director

Enclosures

RO Inspection Rpt No. 050-010/73-05,

No. 050-237/73-06, and No. 050-249/73-07

cc:

Mr. W. Worden, Station Superintendent

Dresden Nuclear Power Station, w/enel

bec: R0 Chief, FS&EB

RO:HQ (4)

Licensing (4)

DR Central Files

-

RO Files