ML19338C994
| ML19338C994 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/28/1977 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19338C995 | List: |
| References | |
| NUDOCS 8009150472 | |
| Download: ML19338C994 (2) | |
See also: IR 05000010/1977025
Text
._
,
.
-
._.
-. _
L.
- _ _. .
.-
~-
v.
,
a
CENTRAL FILES ~
'
<
'
4
.
..
t '
pa * reg
UNITED STATES
- '4
NUCLEAR REGULATORY COMMISP.10N
e
E T e MY ,S
'N
9
necion m
519'$;l.#'S Ni 4[pl
-
'
rs, nooscvur noao
f
etcN euvn. itusois soin
s,, * "a
SEP 2 81977
Docket No. 50-10/77-73
Commonwealth Edison Company
-
ATTN:
Mr. Byron Lee, Jr.
Vice President
Post Office Box 767
Ch ica go , IL 60690
4
Centler.en:
.
...
This refers to the inspection conducted by Mr. J. E. Kohler of this
,
office on August 23-26, 1977, of activities at Dresden Nuclear Power
Station, Unit 1, authorized by NRC Operating License No. DPR-2 and
to the discussion of our findings with Mr. Shelton at the conclusion
a
of the inspection.
The enclosed copy of our inspection' report identifies areas examined
-
<
I
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
obs erva tions , and.intervieus with personnel.
No items of noncompliance with NRC requirements were identified
during the course of this inspection.
During the performance of this inspection, there were certain areas
4
pertaining to containnent integrity where we need additional informa-
tion:
1.
Describe the steps you have taken or plan to take to eliminate
a
the containment leakage through the penetrations containing the
heating steam supply line, flow control valve 510 and the sphere
pressurization line.
(Paragraph 8, Report No. 50-010/77-25)
'
2.
Describe the reasons for the failure of the service and instrument.
air isolation valves and the steps you have taken or plan to take
to prevent such failures in the future.
(Paragraph 11, Report No.
,
50-010/77-25)
3.
The field fabricated bellows are not a "like-for-like" replacement
of the original equipment and our review of your analysis of the
bellows ~ required by 10 CFR 50.59 resulted in the following request
for more information. 'Specifically, describe how you assured your-
selves that the quality of the circumferential and longitudinal
.
1
s
-
.
. _
.
.
, -
-
.
__
.-
. _ _ _
-._
.
-
.
.
s
A
e
- -
,.
.
,
1
.s
'
,
.
i
j
Cormonwealth Edison
-2-
.
t
Company
SEP 2 81977
.
t
field welds vero evaluated to be equal to or better than the
'
original installation, including your evaluation of the long-
,
itudinal field wcld to succcacfully withstand the covenent of
'
the bellous expected durine plant operation.
(Paragraph 5,
.
Report No. 50-010/77-25)
Please provide the above inforration within twenty days of the receipt, .
1-
_ of this letter.
-
,
- -
j
In accordance uith Section 2.790 of the URC's " Rules of Practice,"
I
Part 2, Title 10, Code of federal Pegulations, a cocy of this letter,
,
'
i
the enclosures, and your response to chia letter will be pisced in
the NRC's Public rocurent "com, encept as fo11cvs.
If the enelcsures
.
l
contain information that you or your contractors believe to be
'
prcprietary,' you cust auply in criting to this office, uithin twenty
,
l
days of your receipt of this letter, to withheld auch inforratica
-
4
l
fron public dinclosure. The application rust include a full state-
i
cent of the reasons for which the inforestion in considered pro-
'
prietary, and should be prepared so that proprietary infornetien
identified in the application is contained in an enclosure to the
l
appliention.
i
- Uc will gladly discues any questions you have concerning this inspection.
i
Sincerely,
Cacton Fiorolli, Chief
Reactor Operations and
Nucicar support Erench
.
I
I
l
rnclosurn:
IC In9pection
,
l
Report Fo. 50-010/77-25
I
cc v/ enc 1:
.
!!r. U. B. Stephenson,
Station Seperintendent
Central Files
Perenduction Unit UCC 20b
Prli
1.oca l ' PDR
.
1
D**]D
lD
' M
[d
'
esic
Tic
- 2 42 g
- g
' jgg'(g
'
Anthony I?oisnan, Esq.,.
,
]
.Attornoy
RIII g [
gf g'
. R I I I___,_
_,!31,1 f_
-
RIII
orrica ,
l
-l
, o ,,,,, ,, i, dWoh ler/Is
1.ittle
Fiorelli^
Shafer /p
_,,_
<-
_
I
.
. . . . . .
~
.
.-.
-
.
...
. . - .
..