ML19338C866
| ML19338C866 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/25/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19338C869 | List: |
| References | |
| NUDOCS 8009050415 | |
| Download: ML19338C866 (2) | |
See also: IR 05000364/1980020
Text
[l0
8(
'o
UNITE 3 STATES
g
NUCLEAR REGULATORY COMMISSION
o
,
b
,a
REGION 11
o,
[
101 MARIETTA ST., N.W., SulTE 3100
% ***** e
ATLANTA, GEORGIA 30303
JUL 2 5 tao
In Reply Refer To:
RII:BRC _
g 0!564/80 p
.
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
~ Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office on
June 30 - July 2,
1980, of activities authorized by NRC Construction Permit
No. CPPR-86 for the Farley facility, and to the discussion of our findings held
with W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
~
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
j
the specified period, the report will be placed in the Public Document Room.
l
Should you have any questions concerning this letter, we will be glad to discuss
i
them with you.
)
Sincerely,
h~h A
C. E. Murphy,-th e
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
.
8009050 llT
4
e
E
.
.
Alabama Power Company
-2-
.
JUL 2 51980
Enclosure:
Inspection Report No. 50-364/80-20
cc w/ enc 1:
A. R. Barton, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
.
S
i
1
.
,
2
m