Text

7 gi i

o OPERATING DATA REPORT j

v 2

DOCKET NO.

50-321 6

~

DATE 8-10-80 COMPLETED BY R. M. Bl ukwell TELEPHONE W-%7-7781 OPERATING STATUS Notes Hatch 1

1. Unit Name:

7-80

2. Reporting Period:

2436

3. Licensed Thermal Power (MWt):

809.3

4. Nameplate Rating (Gross MWel:

777.3

5. Design Electrical Rating (Net SIWE):

A 796.3

6. Maximum Dependable Capacity (Gross 31We):

764.3

7. Maximum Dependable Capacity (Net alwe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):

- 10. Reasons For Restrictions. If Any:

This Month Yr. to-Date Cumulative 744.

5111 40175

11. Hours In Reporting Period 535.8 4166.9 29964.9
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 330.8 3751.9 28020.3
14. Hours Generator On-Line 0.0 0.0 o.o
15. Unit Resette Shutdown Hou.,

707424 8425164 58778199 1'

16. Gavn Thermal Energy Generated,(MWH) 213240 2768540 19039d80
17. Gross Electrical Energy Generated (MWH1
18. Net Electrical Energy Generated (5tWH).

196661 2635159 1809709?

44.5 73.4 69.7

19. Unit Service Factor 44.5 73.4 69.7
20. Unit Availability Factor 34.6 67.5 58.9
21. Unit Capacity Factor iUsing MDC Net!

34.0 66.3 58.0

22. Unit Capacity Factor EUdng DER Net) 55.5 26.6 21.6
23. Unit Forded Outage Rate
24. Shntdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achined

26. Units In Test StatusIPrior o Commercial Operation):

a INITIA L CRITICA1.lTY INITIAL ELECTRICITY COMNERCIA L OPER ATION

.._i....

(9/773 g (1081803kI j

^

l J:I l

i 1

. ~

AVERAGE DAILY UNIT POWER LEVEL l

t t

i DOCKET NO.

50-321

~

l Hatch-1 UNIT orn 8-1-0-80

~

COMPLETED By.R.

M.

B1a'c kw e ll i

l TELEPHONE 912-367-7781

~

2 MONTH 7-80

.s.

~

DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe.N,q.

(Mwe.Neg)

.1.

u..

f-

  • - rq 37 747 V M.,. \\(' s. - -

18 748

r..

2 s

726 3

' C' '.

19 F-gy;u v r..- - :33 233 20 T :'

T 21

-15 6

-18

-15 22 7

-IS

-15 J

g

-11

- 4

-15 s.

-12

-15 9

25

-12 12-

' ' ' ~

  • 10 26 11 9

185 27 I

427 511 I

12 28 613 645 13 29 g4 703 710 30 13 707 3g 713 16 743

  • 1

=

1 INSTRUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the rehorring in inth. Compute to the nearest whole megawatt.

i.*

i

.~

~ - >

n

.R r

I l

~

50-321 i

DOCKET NO g

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME 11atch 1 l

DATE 8-10-80 COMPLETED BY R. M. Blac6well REPORT MON'lli 7-RA TELEril0NE 212-367-7781 i.

4

?

b T

w

,{ -

} {3 U

Licensee

. [/[.,

... V, 'f

' ~.

., ) -

Cause & Cor,sective N.,

Dai, 8.

g g

Event 3,1

^5 tion 88 i.,

Presen Recurrence jgg Report #

o-v; s ;r;..*

+-

i (1,'.5 "

  • [h..

s

%.. y,; 4,f.W 8026 800701 F

144 A'

4 l'-80-69 CJ VALVfx.9d -Unit l'n cold shutdown due to llPCI..

failure since 6-27

- 9. k,XX -

.a +- - -

i --

s P027 800707 F

115.62 A

4 1-80-80 MA PIP.

' Unit remained shutdown for repair -

of crack in RWCU return line to feedwater -

802,8

800712, F

27 D

5

/NN RB CONROD Reduce' load in order to perform" rod pattehi adjustment l

80-29 800719 F

'10 B

5 NA*

HA VALVES Reduced load in order to perfonn control valve testin9 8030 800720 F

12.53 B.

2 NA IC ACCUMU Rx manually scrammed per IEB #80-l'7 I

80-32 800726 F

10.95 A

3 NA-

  • CH PUMPXX' Rx auto scram on low Rx water level loss of feedpump i,

3 4

I 2

F: Fossed Reasod:

MethoJ:

Exhible G *rinssencilons 5: Scheduled A Einuipment Failure (Esplain) l-Manual for Pseparailun of Data

h. Maintenance or Test 2 Manual Scram.

Entry Shecis for I.6censee J Automatic Scrain.

Event Repost (LER) Fde (NUREG-C Hefueling s

' D.Regulaiosy Restilction 4 Other (Explain) 01611 I: Operaine Tra!ning & IJecuse Examineelen F Administrative f

Exhible I S$ine Source G.Opesaiional ilssur (Explain),

)

(9/77)

IlOther(Esplain) g

,j e

p I.

1, r

t 50-321 l

i DOCKET NO.

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME

' Hatch 1 i.

4 DATE -

8-10-80 j

~

i COMPLETED ay R., M. Blackwell_

7-80 912-367-7781 r

REPORT MONTil TELEPilONE l

i i

I i

i "t.

J E

'.J,.

Cause & Currective

.]I 4

Y Licensee E*

aq,..

Action jo

f. d. *, -

r.

3*-

di'3 H.i.

Date

{

7."

j

, y a:

Event (Ig f' '

Prevent Recurrence

'}o Uj.M u

.j di F Repori #

,\\

H a.

b

'. Yhd/l13dyf'. '

%: ~

.r.

my f.L% J. ~ ;

i

i

,F.5.. S

. c.... 9 XX BLOW 55 t' Unit remained s/d for.,drywell fan w

80-31 800721 F

130.1 B

A NA i

Jr% ntenance I

i..

p, 'C"

... _ ;, c, 80-33 800727 F

18

.D 5

NA.

RB CONRAD.*

Reduced load in order to eprform rod

~

pattern adjustment I

-[

j j

I

\\

l I

l I

3 4

Reason:

Method:

Exhibit G-lhstructions

f...

j 1

2 l

F: Forced

.

  • Ast:ituipment Failure (Explain)

I Manual for Preparation of Daia l'

S: Scheduled It. Maintenance of Ted 2 Manual Scraen.

Entry Sheets for Licensee

.C.Hefueling 3 Automatic Scrasn.

Event Repost (LER1 File (NUREG.

  • D Regulaltny Resssicilon 4 Other (Emplain) 01611 i

t I-E O.esator Temining & Ucense Esseninallen 5/

4, i-i F Administrative

) Exhibil l Sasse Source j

G. Operational Error (Emplain)

I (9/77)

Il-Ollier (Explain)

,h

~*

S

o t

Jd

  • ^
NARRATIVE REPORT
  • ~

UNIT 1 July 1st Reactor remained shutdown due.to failure of high pressure coolant injection system from 6-26-80

'I to 7-7-80

.. ~

July'7th Crack was discovered in RWCU return line-to feedwater.

Crack was repaired and reactor went

-I critical at 09:20 on 7-10-80 July 10th 11:04 Rx scram on APRM A and APRM E upscale trip.

Rx went critical. at 23:40 on 7-10-80 July 12th At 07:27 reduced load in order to perform rod pattern adjustment July 19th 21:25 reduced load in order to perform control valve tests y '

July 20th Unit off line at 15:18; Rx manual scram at 19:27 per IEB #80-17.

Scram discharge volume analysis (pressure,

temp, and valve testing) proved satisfactory.

Unit remained down while performing drywell fan maintenance.

Rx went critical at 14:52 on 7-25-80 July 26th Unit on line at 14:06, Rx auto scram at 18:38 turbine tripped on low Rx water level, loss of feedpump.

HPCI test performed, HPCI performance found satisfactory July 27th 00:05 Rx critical, generator on line at 05:35 July '2 8th 19:30 reduced load in order to per ferm rod pattern adjustment There was no single release of radioactivity or single radiation exposure which accounts for more than 10% of the allowable annual value's during July of 1980.

e e

om.,,

h

.?

jd HATCH 1 SAFETT - RELATED MAINTENANCE REQUESTS TO BT REPORTED FOR JULY 1980

~

NUMBER DATE COMPLETED DESCRIPTION TECT575 7-19-80 Reroute line from EGR actuator to remote servo capped two lines.

left going to oil sump per DCR'80-221 (HPCI Turbine Oil)

" ~~

80-3527 7-8-80 Welded up gap around support plates on E11-RHRH-274 80-3527 7-8-80 Welded support lugs to penetration sleeve on RHRH line 80-3532 7-10-80 Fabricated snubber transitions for Ell-RHR B196 and 313 RHR suction line supports 80-3338 7-14-80 Replaced K11 contacts on rod out block alarm 80-3587 7-14-80 Replaced limit switches on dw/fp monitor outboard isolation valves 80-3783 7-23-80 Calibrated 1E11-R602A on "A"

loop of RHR SW flow indicator 80-3528 7-17-80 Modified end plates on hangers 80-2920 7-2-80 Replaced existing INS snubber with a PSA-1 snubber per DCR 80-15 80-3571 7-11-80 Welded cracks in RWCU return line 80-695 7-23-80 Installed selectio'n on electronic ~

water treater per DCR 78-227 80-2700 7-6-80 Performed surveillance of mechanical snubbers per request e

I e

l s

e 6