Forwards IE Insp Repts 50-259/80-29,50-260/80-22 & 50-296/80 -23 on 800707-10.No Noncompliance Noted
ML19338C319
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/06/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19338C320 List:
References
NUDOCS 8008150097
Download: ML19338C319 (2)


See also: IR 05000259/1980029

Text

--

NATER' t TFN:S!GTED UTRD7 TH

[M

1,

A

Cala AINS 2.750 GFGiti.'ATLIN

p+**

g Qf

g

!g

UNITED STATES

ggg

T

NUCLEAR REGULATORY COMMISSION

)

n

,

$

p e

REGION ll

g[

0,

101 MARIETTA ST., N.W., SUITE 3100

i

ATLANTA, CEORGIA 30303

In Reply Refer To:

50-259/80-29

/.,,e 0 'i 1980

n

50-260/80-22

50-296/80-23

'

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the routine inspection conducted by A. Tillman of this

office on July 7-10, 1980, of activities authorized by NRC Operating

License Nos. DPR-33, DPR-52 and DPR-68 at the Browns Ferry Nuclear Plant

and to the discussions of our findings held with J. L. Harness at the

conclusion of the inspection.

Areas examined during this inspection included your Physical Security

Program as implemented under the provisions of Title 10, Code of Federal

RegulationsrPart437 " Physical-Protection uf-P1 ants 7nd Materials," and

-

the specific requirements of your approved Security Plan. Within these

areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, perfcnnance tests,

and observations by the inspector.

Within the scope of this inspection, no new items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

As per discussion between K. H. Besecker of your office, and members of

my staff on August 5,1980, it is our under;tanding that we will be

provided a list of firm dates for installation and operability of security

equipment required by your Physical Security Plan on August 6, 1980.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, activities involving

safeguards and security measures are exempt from public disclosure;

therefore, the enclosed inspection report with the exception of the

report cover page, which is an ins;,ection summary, will not be placed

in the Public Document Room.

8 0080150cg

mAitutTmsmTTra mama

t

CONTAINS 2.193IHf0RMATION

LVilLhi sL llLU d..it liU F.Li'is.ein

r

CONTAINS 2.7NINF0TdATISH

AUG ()6 b00

,

Tenness e Valley Authority

-2-

fs

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

6

James P. O'Reilly

Director

,

Enclosures:

1.

Inspection Report Nos. 50-259/80-29,

50-260/80-22, and 50-296/80-23

(Exempt from Disclosure)

2.

Inspection Summary

(NotExempt)

cc w/ enc 1:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers, Project Engineer

.

H. N. Culver, Chief, Nuclear Safety

Review Staff

MATERIAL TRANSMITTED HEREY.1TH

CONTAINS 2.793 INF0ntAT13N

-_

. . _ _ _ . . . . _ . _ _ . . . . _ _ .

. _ - .

_