s Appendix A
( )
NOTICE'0F VIOLATION Commonwealth Edison Company Docket No. 50-373 Based on the inspection conducted May 12 through June 16, 1980, it appears that certaic of your activities were in noncompliance with NRC requirements as noted below. This item is an infraction.
10 CFR 50, Appendix B, Criterion II requires, in part, that activities affecting quality be accomplished under suitable controlled conditions, such as adequate cleanness. Criterion XIII requires, in part, that measures be established to control the storage and preservation of mater-fal and equipment in accordance with work and inspection instructions to prevent damage or deterioration. The Quality Assurance Program, Quality Requirement QR2.0, contains a Commonwealth Edison Company commitment to the regulatory position of Regulatory Guides 1.38, Rev. 2 and 1.39, Rev.
2 which endorse the requirements of ANSI N45.2.2-1972 and N45.2.3-1973, resnectively.
Contrary to the above on May 23, 1980, the licensee was not providing adequate controls to maintain cleanness of the reactor vessel and on May 29, 1980, the licensee was not providing adequate controls to insure protection of the 1A Diesel Generator Air Start System Air Compressor Electric Drive Motors as required by ANSI U45.2.2-1972 and N45.2.3-1973.
This is a repetitive item of noncompliance in that similar problems were identified twice previously in NRC Inspection Reports No. 50-373/79-11, dated March 15, 1979, and 50-373/80-15 dated May 9, 1980.