Ack Receipt of 800718 Interim Deficiency Rept Re out-of-tolerance Conditions of Anchor Bolts & Nuts
ML19338C255
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 07/28/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
References
NUDOCS 8008140293
Download: ML19338C255 (1)


Text

'

6

~

6

-f C8T0 UNIT ED STAT ES 9(0,,

NUCLEAR REGULATORY COMMISSION

+

y a

R EGloN iti 5

f 799 ROOSEVELT ROAD g

cLEN ELLYN, ILUNOt$ 60137 SUL 2 819801 Docket No. 50-483 Docket No. 50-486 Union Electric Company ATTN:

Mr. John K. Bryan Vice President - Nuclear Post Office Box 149 St. Louis, MO 63166 Gentlemen:

Thank you for your interim report dated July 18, 1980, pursuant to 10 CFR 50.55(e) regarding out of tolerance conditions on anchor bolts and nuts. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely,

_ w[n Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/II Director, AEQD Chief, OEB/MPA IE Files cc w/ltr dtd 7/18/80:

Central Files PDR Local PDR NSIC Regions I & IV Ms. K. Drey Mr. Ronald Fluegge, Utility Division, Missouri Public Service Commission 1

1 8008140SD q

i G

o UNION ELECTRIC COMPANY teos ORATIOT STREET ST. Louis. MISSOURI "T7ff, "","

.,.6.u..7.......'....

July 18, 1980

.,onu x...y.

Mr. James G. Keppler, Director Region III Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 ULNRC-366

Dear Mr. Keppler:

SUBMITTAL DATE EXTENSION INTERIM REPORT - ANCHOR BOLTS AND NUTS CALLAWAY PLANT UNITS 1 AND 2 On Friday, June 20, 1980, we provided Mr. H. M. Wescott verbal notification of a 10CFR50.55(e) report regarding out of tolerance conditions on major bolt diameters and minor nut diameters for material supplied by Industrial Mechanics, Inc.

An inspection program has been established and equipment is on order to complete the inspection.

Based on the time required 2or equipment deliveries, field inspection and evaluation of the data from the field inspection, we anticipate that the date of issue of our final report will be December 1, 1980.

Ver truly yours, f

\\A N

@v John K. Bryan WIIZ/sla cc: 4 M. Wescott, Region III B. E Grier, Region I Vich- : Stello Jr., Director Office of I&E K. \\

Seyfrit, Region IV W. A IIansen, NRC Resident Inspector, Callaway Plant Missouri Public Service Commission f

JUL 2 31980 a

ncc93%